The engineer will need to set the distance to 130 for the static link so that it becomes a floating static route.
<h3>What is Floating static routes?</h3>
This is known to be a static routes that is said to have a kind of administrative distance that is also known to be bigger than the administrative distance of any other static route or dynamic routes.
Note that the value 130 stands for the next most logical value, nd as such it is to know that the right route comes first in the steps for administrative distance.
Learn more about WAN from
brainly.com/question/11352260
The events A and B are the outcomes of the probabilities in the system
The entropy of the system is 0
<h3>How to determine the entropy?</h3>
The probabilities are given as:
P(A) = 10/10
P(B) = 0/10
The entropy is calculated using:
So, we have
Evaluate the products
Evaluate the sum
Evaluate the quotient
Express 1 as 2^0
Apply the power rule of logarithm
Evaluate the product
H(x) =0
Hence, the entropy of the system is 0
Read more about probability at:
brainly.com/question/25870256
Answer:
<em>This program is written in python programming language.</em>
<em>The program is self explanatory; hence, no comments was used; However, see explanation section for line by line explanation.</em>
<em>Program starts here</em>
length = float(input("Length of small cube: "))
volume = 27 * length**3
print("Volume: "+(str(volume)))
Explanation:
The first line of the program prompts the user for the length of the small cube;
length = float(input("Length of small cube: "))
The volume of the 27 identical cubes is calculated on the next line;
volume = 27 * length**3
Lastly, the calculated volume of the 27 cubes is printed
print("Volume: "+(str(volume)))
I would say a because it was lots of letters and numbers
Answer:
Analysis Phase
Explanation:
The Analysis Phase is where the project lifecycle begins. The Analysis Phase is where deliverables are broken down. The Analysis Phase is also the part of the project where the overall direction that the project will take through is identified. Also, in the Analysis Phase requirements are gathered. Gathering requirements in this phase involves probing users to know what they need and how they desire the system to function.