Answer:
Building height is measured from finished grade located within 2 feet of the foundation wall to the highest point on the building or structure. ... The building height is the vertical distance between finished grade and the highest point on the building, provided that the measured elevation does not include fill or berms.
I’m not really good at maths and I also don’t understand the question but just check it out
Answer:
No
Step-by-step explanation:
Answer:66 meters
Step-by-step explanation:
just change the negative to a positive and add them together. It would be 66.
Answer:
?×
(
1
−
50/
100
)
×
(
1
−
10/
100
)
=
$
315 ?
=
$
315
/(
.5
)
(
.9
)
=
$
700
Step-by-step explanation: