1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
exis [7]
4 years ago
13

A local business prides itself on paying its employees well over the federal minimum wage. The amount over minimum wage and the

years of experience for each employee at the company is recorded in the graph below. please help
A.y=2.58(1.09)^x
B.y= -0.41x + 2.30
C.y=0.39x + 2.20
D. y= -x^2 + 0.43x +2.10

Mathematics
1 answer:
algol [13]4 years ago
4 0

To approximate a scatterplot, we use lines of best fit. Sometimes these aren't lines because the trend may not be linear, like temperature. The average temperature a town tracked monthly would look like a sinusoid. Here though, we can see that this is probably linear. It increases every other year at a near constant rate. Even plugging in numbers gives us near enough values that the others could not compare with. The first function has a problem - it grows too fast. The second equation also has a problem, the slope. The wage is increasing so the function should too. The third is most likely the right one. The fourth does not work because it becomes negative almost immediately.

Through some inductive reasoning, we can say that the most probably line of best fit would be C.

You might be interested in
Craig went bowling with $25 to spend. He rented shoes for $5.25 and paid $4.00 for each game. What was the greatest number of ga
sineoko [7]

Answer:

Craig has

$25−$5.25 for shoes. In other words, he has $19.75 Now when you divide this amount by $4.00, you will get numbers of games he played.

$19.75

$4

=4.9375

or only 4 games.

Step-by-step explanation:

6 0
3 years ago
Read 2 more answers
Sarah and Nancy each drive 600 miles. Sarah's average speed is represented by x miles per hour. What does the denominator of the
arlik [135]

The denominator of the rational expression 600/(x-4) is x-4.

We know x represents Sarah’s average speed. So x-4 will also represents the average speed. And x-4 represents 4 mph less than the average speed of Sarah, x.

Therefore, option a) is correct.

6 0
3 years ago
Read 2 more answers
Suppose task B follows task A. The likelihood that a problem will occur with task A is 0.5, and the time to correct the problem
jasenka [17]

Answer:

The risk consequence of both activities is 1.6 months.

Step-by-step explanation:

We can define a randome variable D: total delay time for the project, and calculate its expected value.

This would be the risk consequence of both activities.

The expected delay time for the project is the sum of the expected delay for task A plus the expected delay for task B. It is assumed the likelihood of a problem in any task is independent of the other.

Then, each expected delay for a task is equal to the probability of a problem multiplied by the consequence (delay time).

E(D)=E(D_a)+E(D_b)=p_aT_a+p_bT_b\\\\E(D)=0.5*2+0.2*3=1+0.6=1.6

The risk consequence of both activities is 1.6 months.

6 0
3 years ago
A company produces two types of solar panels per year: x thousand of type A and y thousand of type B. The revenue and cost equat
jolli1 [7]

Answer:

  • 7000 type A
  • 6000 type B

Step-by-step explanation:

We assume your equations are intended to be ...

C(x,y)=x^2-2xy+9y^2+3x-87y-6\\R(x,y)=5x+7y

Then the profit equation is ...

P(x,y)=R(x,y)-C(x,y)=5x+7y-x^2+2xy-9y^2-3x+87y+6\\=-x^2+2xy-9y^2+2x+94y+6

The partial derivatives of profit with respect to x and y are zero when profit is maximized.

  ∂P/∂x = 0 = -2x +2y +2

  ∂P/∂y = 0 = 2x -18y +94

Simplifying, these equations are ...

  • y = x -1
  • x -9y = -47

Substituting the first into the second gives ...

  x -9(x -1) = -47

  -8x = -56

  x = 7

  y = 7 -1 = 6

The company will maximize profit by selling 7000 panels of type A and 6000 panels of type B.

5 0
3 years ago
White shapes and black shapes are used in a game. Some of the shapes are circles. All the other sahpes are squares.
seropon [69]

Answer:

9/32

Step-by-step explanation:

BC = black circle

BS = black square

WC = white circle

WS = white square

Given:

(WC + WS) / (BC + BS) = 5 / 11

WC / WS = 3 / 7

BC / BS = 3 / 8

Find: (BC + WC) / (BC + BS + WC + WS)

Solve for WC and BC in the last two equations, then substitute into the first:

WC = 3/7 WS

BC = 3/8 BS

WC + WS = 5/11 (BC + BS)

3/7 WS + WS = 5/11 (3/8 BS + BS)

10/7 WS = 5/8 BS

WS = 7/16 BS

Therefore:

WC = 3/7 WS

WC = 3/16 BS

Substitute:

(BC + WC) / (BC + BS + WC + WS)

(3/8 BS + 3/16 BS) / (3/8 BS + BS + 3/16 BS + 7/16 BS)

(9/16 BS) / (2 BS)

9/32

5 0
3 years ago
Other questions:
  • Answer the following question regarding the table below.
    11·2 answers
  • the volume of pyramid shown above is 147.97units and the height is is 9.6 units find the length of one edge of the square base
    12·1 answer
  • What is 25 multiplied by 3
    11·2 answers
  • WILL GIVE BRAINLIEST!! 100 POINTS!
    9·1 answer
  • Find the equation of the line with​ y-intercept 5 and slope 5/9
    6·2 answers
  • Please help (PLEASE DO NOYPE GIBBERISH FOR POINTS.)
    6·1 answer
  • At what point do the lines y = -x + 5 and y = 2x – 1 intersect?
    11·1 answer
  • Which equation has the solution x=4. A) 4x= 20<br> B) x/2= 8<br> C) x + 8 = 3x<br> D) x= x+5/2
    12·2 answers
  • Find the geometric mean of 5 and 8. Write your answer in the simplest radical form.
    10·1 answer
  • Question 12(Multiple Choice Worth 1 points)
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!