So, we need to consider what is being done.
So, lets start with the -3.
-3*
Now, lets see what's next
2 times a number is the same as saying 2x, then add one.
That is equal to five.
-3(-2x+1)=5
Now,
6x-3 = 5
6x = 8
x= 8/6
Answer:
Ratios to roses to lilies....6:9
Reduced.....2:3
Step-by-step explanation:
Pretty simple doesn't need explaining
4.63 cubic yard.
Given,
The length of sidewalk, l = 100 feet,
Width, w = 5 feet,
Depth, h = 3 inches = 0.25 feet,
Thus, the volume of the concrete needed for making the sidewalk,
= 125 cubic feet,
∵ 1 cubic yard = 27 cubic feet,
⇒ 1 cubic feet = cubic yard,
Thus, the quantity of concrete needed = ≈ 4.63 cubic yard.