15 electricians worked for 24 days to the whole job, now, there are 15 of them, so on any given day, each electrician worked one whole day, in 24 days, that one electrician worked 24 days total.
now, there were 15 electricians on any given day though, since each one of them worked the whole day that one day, so the "days work worth" on a day is 15, so the house gets 15days worth of work because of that.
so how many "days worth" did all 15 do on the 24 days, well, 15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15+15, namely 15 * 24, or 360 days worth of work.
since it takes 360 days worth of work to do the whole wiring, in how many days would 18 electricians do it? 360/18.
Because each ticket costs 1 and she spends 8 she would be buying 8 tickets
She has 8 friends so each one would get 1 ticket
The answer is 1
Answer:
if the equation is f(x)=ax^2+bx+c
Step-by-step explanation:
How the quadratic formula works:
For any quadratic equation ax² + bx + c = 0, the solution is

.
In the case of our equation 7x² - x = 7, first we need to subtract 7 from each side so that we have 0 on the right.
7x² - x - 7 = 0
Identify the values of a, b, and c.
a = 7, b = -1, and c = -7.
Plug these into our quadratic formula and solve.

There are two values for x: (1+√197)/14 and (1-√197)/14.
The approximate values for these are 1.073976 and -0.931119.
To find the percentage of a number, first, convert it to a decimal and then multiply.
To convert a percentage to a decimal, move the decimal point over 2 spaces to the left. That makes 80% = 0.80
Then multiply 0.80 by 30.
0.80 • 30 = 24
Peggy got 24 questions correct.