The answer is 2900mg because you have to divide the two numders
After plotting the quadrilateral in a Cartesian plane, you can see that it is not a particular quadrilateral. Hence, you need to divide it into two triangles. Let's take ABC and ADC.
The area of a triangle with vertices known is given by the matrix
M =
![\left[\begin{array}{ccc} x_{1}&y_{1}&1\\x_{2}&y_{2}&1\\x_{3}&y_{3}&1\end{array}\right]](https://tex.z-dn.net/?f=%20%5Cleft%5B%5Cbegin%7Barray%7D%7Bccc%7D%20x_%7B1%7D%26y_%7B1%7D%261%5C%5Cx_%7B2%7D%26y_%7B2%7D%261%5C%5Cx_%7B3%7D%26y_%7B3%7D%261%5Cend%7Barray%7D%5Cright%5D%20)
Area = 1/2· | det(M) |
= 1/2· | x₁·y₂ - x₂·y₁ + x₂·y₃ - x₃·y₂ + x₃·y₁ - x₁·y₃ |
= 1/2· | x₁·(y₂ - y₃) + x₂·(y₃ - y₁) + x₃·(y₁ - y₂) |
Therefore, the area of ABC will be:
A(ABC) = 1/2· | (-5)·(-5 - (-6)) + (-4)·(-6 - 7) + (-1)·(7 - (-5)) |
= 1/2· | -5·(1) - 4·(-13) - 1·(12) |
= 1/2 | 35 |
= 35/2
Similarly, the area of ADC will be:
A(ABC) = 1/2· | (-5)·(5 - (-6)) + (4)·(-6 - 7) + (-1)·(7 - 5) |
= 1/2· | -5·(11) + 4·(-13) - 1·(2) |
= 1/2 | -109 |
<span> = 109/2</span>
The total area of the quadrilateral will be the sum of the areas of the two triangles:
A(ABCD) = A(ABC) + A(ADC)
= 35/2 + 109/2
= 72
15% of 33 =
= 15% * 33
= 0.15 * 33
= 4.950 students in that class are left-handed
It is true that 3=4 times 3\4 because 4 times 3 equals 12 while 12 divided by 4 equals 3.
3=3 is true.
Answer:
The bulbs should be replaced each 1436.9 hours.
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

How often should the bulbs be replaced so that no more than 1% burn out between replacement periods?
This is the first percentile of hours. So it is X when Z has a pvalue of 0.01.
So it is X when Z = -2.33.




The bulbs should be replaced each 1436.9 hours.