Answer:
90
Step-by-step explanation:
The sum of squares of the deviation from mean=sum(x-xbar)²=?
x
12
6
15
9
18
12
xbar=sumx/n
xbar=(12+6+15+9+18+12)/6=72/6=12
x x-xbar (x-xbar)²
12 12-12=0 0
6 6-12=-6 36
15 15-12=3 9
9 9-12=-3 9
18 18-12=6 36
12 12-12=0 0
sum(x-xbar)²=0+36+9+9+36+0=90
So, the sum of squares of the deviations from the mean is 90.
Megan`s plant:
Rate: ( 7 - 4.5 ) / ( 2 - 1 ) = 2.5 in per week
Suzanne`s plant:
Rate: ( 7 - 5 ) / ( 2 - 1 ) = 2 in per week
Answer:
D ) Megan`s at 2.5 inches per week
<u>Answer:</u>
(i) Total cost of the flat is Rs. 540000.
(ii) Expenditure incurred on labour is Rs. 150000
<u>Step-by-step explanation:</u>
According to the question, cement cost is Rs. 112500, which represents 75° in the pie chart.
(i) The total cost of the flat is represented by the total 360° in the pie chart.
∴ Using unitary method
75° represents Rs. 112500
⇒ 360° represents =
× 360
= Rs. 540000
∴ Total cost of flat = Rs. 540000
(ii) Similarly, to calculate the cost of labour, represented by 100° in the pie chart, we can use the unitary method:
75° represents Rs. 112500
⇒ 100° represents =
× 100
= Rs. 150000
∴ Cost of labour = Rs. 150000
Answer:

Step-by-step explanation:
Given expression:

Note: <em>The value of "x" is undefined because the given sum is not an equation. Thus, I will simplify the expression as much as possible. </em>
Let us simplify all the distributive properties stated in the expression.
Apply the distributive property rule <u>[a(b + c) = ab + ac]</u>

Since 5(x) is being subtracted from 5(x), we get:


Finally, let us simplify the sum of the product of (5 and 4) and (5 and 2).


Learn more about one-variable expressions: brainly.com/question/15139917