For this case we have the following relationship:
Total cost = (Unit Cost) * (Number of meters)
Therefore, substituting values in the given equation we have:
Total cost = (10.69) * (0.70)
Total cost = $ 7,483
This means that Sid will spend $ 7,483 to do the work.
Answer:
Sid will spend about $ 7,483.
Answer:
Lose $0.05
Step-by-step explanation:
There are 38 possible spots on the roulette wheel (numbers 1 to 36, 0 and 00).
If the player can choose four numbers on single $1 bet, his chances of winning (W) and losing (L) are as follows:

The expected value of the bet is given by the probability of winning multiplied by the payout ($8), minus the probability of losing multiplied by the bet cost ($1)

On each bet, the player is expected to lose 5 cents ($0.05).
Answer: 3600 seconds
Step-by-step explanation:
60 seconds in a minute
60 minutes in an hour
(60)(60) = 3600
Step-by-step explanation:
first solve for h


