Answer:
-4 to -1.5
Step-by-step explanation:
When the graph start to slope downwards or go down its decreasing. So when the hump starts to go down at (-4,0) it then starts to go up again after (-1.5,0). Hope this helps:)
Total cost for tiles and paints is $924.
Step-by-step explanation:
We have been given that a community hall is in the shape of a cuboid. The hall is 40m long 15m high and 3m wide.
The paint will be required for 4 walls and ceiling.
Let us find area of walls and ceiling.
Therefore, the area of walls and ceiling is 1410 square meters.
Given: Cost for 10 litre of paint is $10 and 10 litre paint covers 25 square meter. Therefore,
Therefore, the total painting cost is $564.
Tiles will be required for floor. Let us find the area of floor.
Given: 1m squared floor tiles costs $3. So,
Therefore, the total cost for tiles is $360.
Now let us find combined total cost of tiles and paint.
Therefore, the combined total cost of tiles and paint is $924.
-2x + 16 < = 10
-2x < = 10 - 16
-2x < = - 6
x > = -6/-2
x > = 3............so any number that is 3 or above is in the solution set
NUMBER 2 is 240 because 6 times 4 times 10 is equal to 240. I am still working on the others