Answer:
independent
Step-by-step explanation:
We put the independent variable on the x axis ( or horizontal) and the dependent variable on the y axis ( or vertical)
Answer:
Step-by-step explanation:
Answer:
the cost of running the boarding
house for 600 students is N61,000
Step-by-step explanation:
Let C represents cost
K1 represents first constant
K2 represents second constant
C= k1+k2n
3500 = k1 + 25 k2............. Eqn(1)
6000= k1 + 50 k2 .............. Eqn(2)
Subtract eqn(1) from eqn(2)
2500= 25k2
K2= 2500/25
K2= 100
To get k1 from eqn(1)
3500 = k1 + 25 k2
Substitute the value of k2
3500 = k1 + 25 (100)
3500= k1 +2500
K1= 3500- 2500
K1= 1000
The equation connecting them;
C= 1000+ 100n
The cost of running the boarding
house for 600 students is
n= 600
C= 1000+ 100(600)
C= 1000+60000
C= N 61,0000
Step-by-step answer:
standard deviation (sigma) = 12 inches
mean (mu) = 90 inches.
For 36 years, the standard error of the mean is
e = sigma / sqrt(n) = 12" / sqrt(36) = 2".
Deviation from the mean
= 92.8 -90 = 2.8
Since the standard error of the mean follows the normal distribution, we have
Z=(92.8-90)/2 = 1.4
Looking up the normal distribution tables, or check R, we find
P(Z>1.4) = 1-P(Z<1.4) = 1-0.9192433 = 0.08075666
Answer: P(snowfall>92.8) = 0.0808 (to four decimal places)
If you would like to know how many total hours did Jeff work today, you can calculate this using the following steps:
4 2/3 hours in the morning + 3 3/4 hours in the afternoon = 4 2/3 + 3 3/4 = 14/3 + 15/4 = 56/12 + 45/12 = (56 + 45) / 12 = 101/12 = 8 5/12 hours
Jeff worked 8 5/12 hours in total.