Answer:
im not sure, but i have
Step-by-step explanation:
------------------------------------------------------------------
Push Mower
------------------------------------------------------------------
It takes 5 hours to complete the job
1 hour = 1/5 of the job
------------------------------------------------------------------
Riding Lawn Mower
------------------------------------------------------------------
It takes 3 hours to complete the job
1 hour = 1/3 of the job
------------------------------------------------------------------
Push Mower + Riding Lawn Mower
------------------------------------------------------------------
1 hour = 1/5 + 1/3
1 hour = 3/15 + 5/15
1 hour = 8/15 of the job.
------------------------------------------------------------------
Calculate time needed to complete
------------------------------------------------------------------
8/15 of the job takes 1 hour
8/15 of the job = 1 hour
------------------------------------------------------------------
Divide by 8/15 on both side
------------------------------------------------------------------
8/15 ÷ 8/15 of the job = 1 ÷ 8/15 hour
Whole of the job = 1 x 15/8 hours
Whole of the job = 15/8 hours
Whole of the job = 1 7/8 hours
------------------------------------------------------------------
Answer: 1 7/8 hours
------------------------------------------------------------------
Answer:
one solution and one only
Step-by-step explanation:
Solve the inequality for b
-15b <= 45 divide both sides by -15, since you're dividing by a negative number switch the direction of the sign.
b >= -3
So, your number line is all values of b greater than or equal to -3. Since it is including -3, the circle will be filled and increase to the positive.
X=-6
If you divide both sides by -5 5/5 is 0 & 20/5 is 4 the next step is to subtract 2 from both sides. -4-2 is -6