Answer:
debit card, credit cards usually make people overspend, and cash advance is a bad fee (like $10 minimum usually), and loans have interest
Explanation:
Answer:
Priority programming is a process programming method based on priority. In this technique, the developer chooses the tasks to work according to priority, which is different from other types of programming, for example, a simple round-robin.
On UNIX and many other systems, higher priority values represent lower priority processes. Some of the systems, such as Windows, use the opposite convention: a higher number means a higher priority
<h3>Explanation:
</h3>
Priorities can be dynamic or static. Static priorities are assigned during creation, while dynamic priorities are assigned according to the behavior of the processes while they are in the system. To illustrate, the planner could favor intensive input / output (I / O) tasks, allowing expensive requests to be issued as soon as possible.
Priorities can be defined internally or externally. Internally defined priorities make use of a measurable amount to calculate the priority of a given process. On the contrary, external priorities are defined using criteria beyond the operating system (OS), which may include the importance of the process, the type and sum of the resources used for the use of the computer, user preferences , trade and other factors such as politics etc.
i hope this is right lol
That is an interactive question.
Answer:
This is true but an Engineer is much more than that. They are the professionals of engineering, who do the invention, analyze, design and test complex systems, machines, structures, machines for fulfilling the functional objectives gadgets as well as the requirements while taking into consideration the limitations that come up due to practicality, safety, regulations, and cost.
Explanation:
Please check the answer section.
I think that the answer wiloukd be B. For #31 and for #32 A.