FC = Fixed Cost.
VC = Variable Cost.
Q = Quantity
TC = Total Cost.
Substitute the numbers and find the TC.
After finding the TC, divide it by 150000 to get the cost of toaster per second.
K = (y °F – 32) ÷ 1.8 + 273.15 or K = (y °F – 32) x 5/9 + 273.15
Answer:
A) (the first data set)
Step-by-step explanation:
It is the only one that has enough numbers to be represented by the histogram