Answer:
9
just add 1.5 to each of the numbers
Answer:
And if we use the values obtained we got:
For this case this value means that the expected score is about 7.48
Step-by-step explanation:
For this case we assume the following probability distribution:
X 5 6 7 8 9 10
P(X) 0.05 0.15 0.33 0.28 0.12 0.07
First we need to find the expected value (first moment) and the second moment in order to find the variance and then the standard deviation.
In order to calculate the expected value we can use the following formula:
And if we use the values obtained we got:
For this case this value means that the expected score is about 7.48
In order to find the standard deviation we need to find first the second moment, given by :
And using the formula we got:
Then we can find the variance with the following formula:
And then the standard deviation would be given by:
Answer:
a (9)
add 5 to to 58 and subtract 5 from 5. then divide 63 by 7 and the answer is 9
Answer:
Daisy has one side of the rectangular pen along the wall, so she needs one width, w, and two lengths, 2ℓ. She has at most 125 feet of fencing materials to build the fence for her pen
1 second/24 frames
so if he started with 0 frames
time s = (1/24) (additional f)
but he already had at least 250 frames
so
time s = (1/24)( f-250) or maybe less time if he had more than 250
24 s </= f - 250
or
f >/= 24 s + 250
Step-by-step explanation:
Answer:
Jan earns $4 more per hour than Eli.
Step-by-step explanation: