s = hours it takes the small pipe on its own.
L = hours it takes the large pipe on its own.
we know the small pipe can do it in 11 hours total, so s = 11, so, how much of the whole job has the small done in 1 hour only?
well, if it takes 11 hours to do the whole thing, in 1 hour it has done only 1/11 of the whole job.
we know both pipes working together can do it in 6 hours flat. So in 1 hour only, both of them have done only 1/6 of the whole thing.
in that 1 hour, how much has the large one done? well, it has only done 1/L of the job.

and you can round that up as needed.
Answer:
x=-6
Step-by-step explanation:
use distributive property on the () and times x and 1 by three
then you subtract 6 from both sides
then subtract three from both sides
then divide both sides by 3
your work would look like this:
3(x+1)+6=-9
3x+3+6=-9
3x+3=-15
3x=-18
x=-6
Hope this helps!
Answer:
I got blue 3 and green 7
Step-by-step explanation:
why it is blue 3 is because there are 3 of the blue and for the green there are 4 it landed on the 3 green and that was the 7th one
Answer:
y = -5x + 1
Step-by-step explanation:
y - 6 = -5 (x + 1)
distribute -5 (x + 1) by multiplying
y - 6 = -5x - 5
than add 6 to both sides
y = -5x + 1