1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
artcher [175]
4 years ago
14

!!!!!!! Why isn't A the correct answer? I am having trouble to reason why A is wrong so please help if can!

Mathematics
1 answer:
docker41 [41]4 years ago
4 0

Answer:

d.  x = -3

Step-by-step explanation:

<u />\sqrt{(x + 3)}÷ (x+8)(x-2) = 0

f(x) / g(x) = 0

Variable x cannot be equal to any of the values −8,2 since division by zero is not defined. Multiply both sides of the equation by (x−2)(x+8).

<u />\sqrt{(x + 3)} = 0 ------ square both sides

x + 3 = 0

solve for x:

x = -3

You might be interested in
Which one is a polynomial ? it’s not B!!
Alina [70]
A probably i dont know
7 0
3 years ago
Find the circumference of the circle. <br> A. 11 cm<br> B. 44 cm<br> C. 22 cm<br> D. 33 cm
ira [324]

Answer:

The answer is 44 cm .

which is (B)

5 0
3 years ago
What is the solution to the inequality?<br><br><br> -2x-4 less than or equal to 11
Rashid [163]

Answer:

x ≤  \frac{-15}{2}

Step-by-step explanation:

So first you would start by getting rid of the -4. To get rid of -4, you would need to + 4 on each side leaving you with -2x ≤ 15. Now you need to get rid of -2 from x so that would convert equation to x ≤  \frac{-15}{2}. Hoped it helped!

⭐ Answered by Foxzy0⭐

⭐ Brainliest would be appreciated, I'm trying to reach genius! ⭐

⭐ If you have questions, leave a comment, I'm happy to help! ⭐

4 0
3 years ago
What time is it 120 minutes after midday?​
coldgirl [10]
Midday is 12pm so you add whatever hours to that. Which is 1:20pm after midday (12pm)
7 0
3 years ago
An assembly line with 10 tasks needs be designed. The total time for all tasks is 16 minutes. If you need to produce 30 units/ho
Sindrei [870]

Answer: 8 minimum work stations is what would be needed.

Step-by-step explanation:

The cycle time is computed as the operating time daily divided by the scheduled output.

It is important to note that the daily capacity of the operation layout is the operating time divided by the cycle time.

Therefore,

If you need to produce 30units/hour.

The average cycle time is as follow:

The average cycle time is the average time between the completions of units.

60/30= 2 average cycle time

=16/2

=8

8 work stations is the minimum number that would be needed.

It is important to know that in an assembly line balancing, the minimum number of work station is the ratio of the sum of all tasks time to the cycle time.

5 0
3 years ago
Other questions:
  • The curvature at a point P of a parametric curve x = x(t), y = y(t) is given below, where the dots indicate derivatives with res
    7·1 answer
  • Solve for x. x÷(-2)=1.4​
    15·2 answers
  • Skyler bought a hover board on sale for $300. She purchased the hover board on a day the offering was 40% off. What was the orig
    5·2 answers
  • A soft drink manufacturer wishes to know how many soft drinks adults drink each week. They want to construct a 85% confidence in
    7·1 answer
  • Solve for x and show work<br><br> -2(8x - 1) = 4(3x + 4)
    9·2 answers
  • Need help on this activity!!
    9·1 answer
  • According to the Bureau of the Census, the population of the United States in 1990 was approximately 249 million and in 2000, 28
    14·1 answer
  • Xxxxxxxxxxxxxxcccccccc
    10·1 answer
  • The sum of the first n consecutive even numbers can be found using S = n2 + n. What is the value of n when the sum is 272?
    7·2 answers
  • PLSSS HELP IF YOU TURLY KNOW THISS
    6·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!