1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
faltersainse [42]
3 years ago
14

3/2 (6 - 18x) > 12 Solve

Mathematics
1 answer:
Ivanshal [37]3 years ago
8 0

Answer:

x is less than 1/9

Step-by-step explanation:

Distribute the 3/2 to the (6-18x), which gives you 9-27x is greater than 12. Subtract the 9 over, which gives you -27x is greater than 3. Divide both sides by -27, but when you divide by a negative, you have to flip the sign, so finally, you get x is less than 1/9.

You might be interested in
Three relationships that are equivalent to 18:4
krek1111 [17]
Is that a ratio? then i’ll answer it
6 0
3 years ago
Graph the linear equation to -2x+7y=-21
mr Goodwill [35]

Answer:

This equation is in standard form, so to make graphing easier you need to put it in y=mx+b form or slope, intercept form.

Step-by-step explanation:

I have attached a photo of what the graph would look like.

However, in the future you should know how to turn this into a slope intercept equation.

-2x+7y=-21

+2x        +2x

7y=2x-21

divide the entire equation by 7

y= 2/7x-3

That is a full equation in slope intercept form.

Hopefully this helps!

8 0
2 years ago
Read 2 more answers
Someone please tell formula
ivolga24 [154]

<u>Answer:</u>

(i) Total cost of the flat is Rs. 540000.

(ii) Expenditure incurred on labour is Rs. 150000

<u>Step-by-step explanation:</u>

According to the question, cement cost is Rs. 112500, which represents 75° in the pie chart.

(i) The total cost of the flat is represented by the total 360° in the pie chart.

∴ Using unitary method

75° represents Rs. 112500

⇒ 360° represents = \frac{112500}{75}  ×  360

                                = Rs. 540000

∴  Total cost of flat = Rs. 540000

(ii) Similarly, to calculate the cost of labour, represented by 100° in the pie chart, we can use the unitary method:

75° represents Rs. 112500

⇒ 100° represents =  \frac{112500}{75}  ×  100

                               = Rs. 150000

∴ Cost of labour = Rs. 150000

5 0
2 years ago
Luke is building a storage building and needs to have a slab of concrete poured. He knows the contractor charges an initial cost
kherson [118]
The answer is A.

 y is the total cost, than you would need to multiply x, the number additional number of square feet, which is 3.5x. you would then add 95 dollars to the equation to represent the initial fee. So the equation would look like Y=3.5x+95.

- beanz

8 0
3 years ago
Read 2 more answers
Please help on this one ? :)
rusak2 [61]

Answer:

C. All real numbers

Step-by-step explanation:

7 0
3 years ago
Other questions:
  • Madeline needs to find the slope of the line that passes through the points (9, 12) and (7, 4). She sets up the following work:
    15·1 answer
  • Help doing this problem please!
    12·2 answers
  • Hat is the equation of the quadratic function with a vertex at (2,–25) and an x-intercept at (7,0)?
    14·1 answer
  • Unit rate of $42 for 3 books
    10·1 answer
  • Which of the following best describes the solution to the system of equations below?
    5·1 answer
  • Will give brainiest
    9·2 answers
  • A regular heptagon has a radius of approximately 27.87 cm and the length of each side is 24.18 cm. What is the approximate area
    15·2 answers
  • Solve using elimination.<br> 5x + 7y = -6<br> 4x + 7y = -9
    15·1 answer
  • Estimate 620 / 17 by first rounding each number so that it has only 1 nonzero digit.
    7·1 answer
  • Car insurance: $12
    12·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!