R=1v+h([pi]h^2) all over 3
Answer:
Step-by-step explanation:
x + 12 = y
x = y - 12
Answer:
Minimum cycle time = time for longest task = 2.4 minutes
Maximum cycle time = sum of the times to complete all the tasks = 18 minutes
Step-by-step explanation:
For the minimum cycle time, the reasoning is that all the tasks can be done simultaneously, at some during the assembling task. Hence, minimum time to complete one cycle is the time it takes to complete task that takes the longest time to complete.
For the maximum cycle time, the reasoning here is that each task is done after the completion of the previous task. The total time taken to finish the task will then be the sum of the time taken to complete each task. This usually is at the beginning of operations.
The ship therefore travels 8 nautical miles per hour. If the ship traveled for 1 hour, then it traveled 8 nautical miles. If the ship ... If the ship traveled for 18 hours, then it traveled 144 nautical miles.
Read more on Brainly.com -
brainly.com/question/2259092#readmore
Answer:
Option A: -12x-8=10 is the correct answer.
Step-by-step explanation:
Given equation is:
-4 (3x+2) = 10
We will distribute the equation by multiplying the terms inside the brackets with -4.
Therefore,
-4*3x + 2*-4 = 10
-12x +(-8) = 10
-12x - 8 = 10
The equation -4 (3x+2) = 10 will become -12x-8=10 after distributing.
Hence,
Option A: -12x-8=10 is the correct answer.