Answer:
B. x = -4
Step-by-step explanation:
- 7x - 35 = -7
add 35 to both sides
-7x = 28
Divde both sides by -7
x = -4
If a normal random variable has mean of 0 and standard deviation of 1, it is called a standard normal distribution.
<h3>Normal Probability Distribution</h3>
The z-score of a measure X of a normally distributed variable with mean
and standard deviation
is given by:

- The z-score measures how many standard deviations the measure is above or below the mean.
- Looking at the z-score table, the p-value associated with this z-score is found, which is the percentile of X.
For the standard normal distribution, the mean and the standard deviation are given, respectively, by:

More can be learned about the normal distribution at brainly.com/question/24537145
#SPJ1
Answer:
The quality control facility operates for 10 hours each day.
Step-by-step explanation:
The given function models the number of cars that are put through a quality control test each hour at a car production factory.
The given function is
We need to find the number of hours does the quality control facility operate each day.
Rewrite the given function it factored form.
Taking out the common factors from each parenthesis.
The factored form of given function is c(t)=-(t-10)(t+2).
Equate the function equal to 0 to find the x-intercept.
Number of hours cannot be negative. So from t=0 to t=10 quality control facility operate the cars.
Answer:
6 + 12² = x
There's not an explanation for this-
Answer:
yoy didnt put a picture of the answer choices, so I'm not sure which one this would be, but the answer would be C=5 + .72P
Step-by-step explanation:
C is the total cost, so that would be on the opposite side of the equal sign from P. the 5 would be the constant, since that is the starting price for all packages, and the .72 is the price per pound, so you would have to multiply .72 by P pounds in order to complete the equation.
Hope this helps!