Answer:
She can make cookies for 4.95 weeks
Step-by-step explanation:
2 x 1 2/3 = 3.333333333
16.5/ 3.333333333 = 4.95
Since Jordan is making two batches of Cookies per week, you need to multiply 2 by the amount of resources needed to bake one batch of cookies. So you multiply 1 and 2/3 by 2 to get the amount of resources neccesary for one week of making cookies. Then, you take the full amount of resources that she has, and divide that by the amount she uses per week, that number will give you the number needed to figure out how many weeks she has to bake cookies.
To figure out the number that is being divided to get the whole number in weeks, you would take the 16.5 cups of flour. The reason why this is, is because that Is the starting number of cups that she has. So here you would need to divide the amount you are taking from it each week. This will result in the amount of weeks that she is able to bake cookies with her flour.
The probability is the ratio of the favorable event to the total number of events. Then the probability of the elk caught in the park being unmarked will be 92.44%.
<h3>What is probability?</h3>
Probability means possibility. It deals with the occurrence of a random event. The value of probability can only be from 0 to 1. Its basic meaning is something is likely to happen.
The total number of elk is 5,625.
The number of elk that were marked is 225.
Then the number of elk that were unmarked will be
→ 5625 - 225 = 5,200
Then the probability of the elk caught in the park being unmarked will be

More about the probability link is given below.
brainly.com/question/795909
#SPJ1
Answer:
the answer is=21
Step-by-step explanation:
u have to sum all of its sides
(length+breadth+height).
Answer:
No.
Step-by-step explanation:
It is given that Darius is putting tiles on the roof of his house.
Darius had completed =
th of the work
He takes time =
hours to complete
th of the work
The remaining work = 


∴ Darius completes
th of the work in =
hours
So,
th of the work in =
hours
hours
Therefore total time taken to complete the work
hours
hours
hours
hours
hours
Thus, Darius continues to work at the same rate will not be able to complete the work in 4 hours.
Answer:
For ABC A= (-3,3) B= (0.2) and C= (-3,1)
For DFE D= (0,6) F= (2,6) and E= (2,3)
Step-by-step explanation:
I believe tha name of a sequence of transformation will be translation and the Reflection
Hope this Helped