Let's look at work rates per minute.
Together they can paint the wall in x minutes.
Working together, in 1 minute, they do 1/x of the job.
The student who paints the wall in 16 minutes does 1/16 of the job in 1 minute.
The student who paints the wall in 24 minutes does 1/24 of the job in 1 minute.
Together, they do 1/16 + 1/24 of the job in 1 minute, but from above, we see that together, they do 1/x of the job in 1 minute, so 1/16 + 1/24 must equal 1/x. That gives us our equation.
1/16 + 1/24 = 1/x
1/16 * 3/3 + 1/24 * 2/2 = 1/x
3/48 + 2/48 = 1/x
5/48 = 1/x
x = 48/5 = 9.6
Answer: It takes them 9.6 minutes, or about 10 minutes to do the job together.
Median: middle number
Mean: average
How to calculate the median:
1) line the numbers in order from least to greatest
0 1 2 4 5 24
(you do not need to write all the fours or fives, one four or five is enough to represent it)
2) Next, take one number off each end at a time until you have one number in the middle left (if there are two numbers left in the middle, add them together, than divide them by two)
3) The median is 4 becuase it is in the middle.
How to calculate the mean:
1) Add all the numbers together
0+24+1+4+5+2+5+4 = 45
2) Now we divide 45 by 8 because there are eight numbers in the list
45/8 = 5
3) The mean is 5.
Answer: Median = 4, Mean = 5
live with love, live with Jesus
Im not sure if im correct but I think the answer is 82 hours.
Answer:First three terms: 11,20,29 .
Step-by-step explanation:
Write a systems of equations. tn=a+(n−1)d. sn=n2 (2a+(n−1)d). So,. 110=11+(n−1)d 726=n2(22+(n−1)d).
I hope this is right
2v=-68 I believe is the answer