Answer:
the answer is that of equations 1
Tom--------------
>10 sq ft per minute
Tim-------------------
>3.5*10=35 sq ft per minute
Both painters (10+35)=45
sq ft per minute
let's assume a cubic unit crate----------> V1=1*1*1=1 feet3
<span>the total surface of the cube is S1=6*(1*1)=6 </span>sq
ft
if the volume of the cube increases twice
V2=2 feet3 ------------------- > 2=x*x*x------------- >x=2^(1/3)
And the S2=6*(2^(1/3)*<span> 2</span>^(1/3)=9.5244 sq ft
V2/V1=9.5244/6=1.5874
Therefore
If Tim and Tom-----------------------
> take 1 day----------- > to paint a crate V1
For the crate V2------------- > take 1.5874 days
assuming an 8-hour work day
0.5874*8=4.70 hr-------------- > 4 h 42 min
The answer is 1 day 4h 42 min
h=4 because 4+6=10 and 10/5=2
Answer:
4
Step-by-step explanation:
Slope is
. Or, in other words the distance it travels in the y direction divided by the distance it travels in the x direction. Each time the y variable increments +4 and the x variable increments +1. Which means the line rises 4 units every time it runs 1 unit.
Slope=
For part A, you simply add the two functions a(x) and b(x). The resulting function is then (a+b)(x) = 5x +2.
For part B, you multiply the functions a(x) and b(x). Using the FOIL method, we obtain, 6x^2 -24x + 20x - 80. Simplifying, we get, (a*b)(x) = 6x^2 -4x - 80.
For part C, you replace x in the function a(x) with the expression from b(x). This results to: a[b(x)] = 3(2x - 8) +10. Simplifying, a[b(x)] = 6x - 14.