1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
makkiz [27]
3 years ago
14

Which of the following is the best source of information for learning how far Chicago is from New York city

Social Studies
1 answer:
Oksanka [162]3 years ago
3 0

Answer:The Distance from New York to Chicago is 1,149 kilometers.

You might be interested in
Compare TWO functions of National and Provincial Government
Marianna [84]
The Premier appoints an Executive Council (a cabinet), consisting of members of the legislature, to administer the various departments of the provincial administration. The powers of the provincial governments are circumscribed by the national constitution, which limits them to certain listed "functional areas".
6 0
3 years ago
Why is the Upper Tamakoshi Hydro Project called as a project of National Pride? in which sectors of national development are dir
sergejj [24]

Explanation:

The Upper Tamakoshi hydroelectric power station is a 456MW run-of-the-river project under construction on the Tamakoshi River in the Dolakha District, approximately 200km away from Kathmandu, Nepal.

Construction on the Upper Tamakoshi hydropower project was started in 2011 and was expected to be completed within six years. The project’s progress was, however, hampered due to an earthquake in April 2015. The facility is currently scheduled for commissioning by the end of 2019.

The developer and operator of the project is Upper Tamakoshi Hydropower Limited, an autonomous company established by Nepal Electricity Authority (NEA) in March 2007.

The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.

Upper Tamakoshi hydropower plant make-up

Upper Tamakoshi comprises a 22m-high and 60m-long concrete dam, two 225m-long de-sanding basins, an 8.4km-long headrace tunnel with 32.14m² of cross-sectional area, and an underground powerhouse (142m-long, 13m-wide, and 25m-high) equipped with six Pelton turbine units.

“The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.”

The gross head height of the dam is 822m. Design flood and discharge capacities for the facility will be 885m³/s and 66m³/s, respectively.

Live storage capacity of the dam will be 1.2 million cubic metres. The 2.9km-long tailrace tunnel of the project will have a cross-sectional area of 35m².

Transmission and power purchase agreement

The power generated by the Upper Tamakoshi hydropower plant will be fed into the national grid through a 49km-long double circuit 220kV transmission line between Gongar and the Khimti power station.

The Nepal Electricity Authority (NEA) and Upper Tamakoshi Hydropower Limited signed a draft power purchase agreement (PPA) for the project in 2011. The NEA agreed to purchase the power output of the plant at a yearly average rate of NPR3.50 a unit.

Contractors involved

Norconsult and Lahmeyer provided detailed project design, construction management and monitoring services for the project.

The civil works contract for the project was awarded to Sinohydro Corporation. Andritz Hydro was awarded the contract for the design, manufacturing, and supply of electromechanical equipment, including turbines and generators for the project.

KEC International was contracted for the supply and erection of transmission lines as well as the substation.

Texmaco, an engineering and infrastructure company based in India, was engaged for the hydro-mechanical works for the project.

Financing

The total construction cost of the project was estimated to be NPR35.29bn ($441m) in 2011. Loans were extended by Nepal’s Employees’ Provident Fund ($131.6m), Nepal Telecom ($78.97m), Citizen Investment Trust ($26.32m), and Rastriya Beema Sansthan (RBS, $26.32m) to finance the project.

The Government of Nepal committed to providing a loan of up to NPR11.08bn ($145.8m) for the project.

The project cost has been reportedly escalated by $41.8m due to the delay and disruption caused by the 2015 earthquake.

Related Projects



Balaoi & Caunayan Wind Farm, Ilocos Norte, Phillippines

The Balaoi & Caunayan Wind Farm is an onshore wind farm project under construction by AC Energy in partnership with…

10 Jun 2021



Mutriku Wave Energy Plant

The Mutriku wave energy plant was officially commissioned by Spanish utility Ente Vasco de la Energía (EVE) in the Basque…

07 Jun 2021



Mutkalampi Wind Farm, Central and Northern Ostrobothnia, Finland

Mutkalampi is a proposed 404MW wind farm to be built in Finland by French renewable energy developer Neoen and Prokon…

04 Jun 2021



Rabigh-2 Combined-Cycle Power Plant

The 2,060MW combined-cycle Rabigh-2 independent power project (IPP) is located next to the 1,024MW Rabigh-1 power plant, 130km north of…

04 Jun 2021

Join Our Newsletter

Energy news and in-depth feature articles on the latest energy provider deals, energy innovations and trends in renewables, solar power, offshore wind, hydropower, coal and nuclear power

Receive our newsletter

Sign up to our e-Newsletter here

About us

Editorial Approach

Contact Us

Privacy Policy

Terms and Conditions

© Copyright Verdict Media Limited 2021

Powered by 

We use cookies to ensure that we give you the 

6 0
3 years ago
Extinction is a(n) _____ process; human activity can affect the _____ at which extinction occurs.
Bezzdna [24]
The answer would be: Natural, Rate
Extinction can be considered a natural process because it will happen even without human's intervention.
As a human, we could only help to accelerate or decelerate the speed of extinction, for example hunting lions irresponsibly will accelerate the speed of extinction while creating a conservation will decelerate it 
7 0
3 years ago
During the Civil War, women were left to—
zavuch27 [327]
Memeleewkenebdfhdjehed
7 0
3 years ago
Read 2 more answers
Congress went from most powerful to increasingly deferential to the white house in the:
den301095 [7]

During the middle of the twentieth century, congress became the most deferential to the white house.

The United States Congress comprises most of the legislative branch. The role of this entity is to represent the citizens and create the laws. Moreover, Congress is divided into:

  • The house of representatives
  • The Senate

Throughout history, the United States Congress was one of the most powerful entities in government, this is because during important events such as the independence, the gilded era, the Great depression, etc. the congress had a great influence on the laws of the nation.

Later, during the middle of the twentieth century, Congress underwent important changes in its structure. This cause citizens to have more control over the congress and the congress to become a deferential institution, this means congress needed to represent and respect citizens' will.

Learn more in: brainly.com/question/13619505

6 0
3 years ago
Other questions:
  • What was the northern reaction to the passage of the fugitive slave act
    13·1 answer
  • Which fuel has the shortest span of renewability?
    12·2 answers
  • The ability to remember information while doing another cognitive task
    9·1 answer
  • Which term identifies the gathering of party members who voted in the party’s primary for the purpose of electing delegates to t
    10·1 answer
  • Which of the following is NOT true about self-esteem?
    9·2 answers
  • What has had the greatest impact on the fishing industry in North American over the past 50 years?
    10·1 answer
  • A four-year-old boy is playing by himself. He is pretending to be a doll's father and asks the doll if he wants to go outside an
    15·1 answer
  • Saint Jerome translated the Greek writings of __________.
    13·2 answers
  • Explain challenges help us to face reality
    5·1 answer
  • The text defines ________ as the choice we make to consider others' thoughts and feelings in our communication and general behav
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!