1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Tom [10]
3 years ago
7

For a bolted assembly with six bolts, the stiffness of each bolt is kb=Mlbf/in and the stiffness of the members is km=12Mlbf/in.

An external load of 80 kips is applied to the entire joint. Assume the load is equally distributed to all the bolts. It has been determined to use 1/2 in- 13 UNC grade 8 bolts with rolled threads. Assume the bolts are preloaded to 75% of the proof load. Clearly state any assumptions.
(a) Determine the yielding factor of safety,
(b) Determine the overload factor of safety,
(c) Determine the factor of safety baserd on joint seperation.
Engineering
1 answer:
makkiz [27]3 years ago
3 0

Answer:

  • nP  ≈ 4.9
  • nL =  1.50

Explanation:

GIVEN DATA

external load applied (p) = 85 kips

bolt stiffness ( Kb ) = 3(10^6) Ibf / in

Member stiffness (Km) = 12(10^6) Ibf / in

Diameter of bolts ( d ) = 1/2 in - 13 UNC grade 8

Number of bolts = 6

assumptions

for unified screw threads UNC and UNF

tensile stress area ( A ) = 0.1419 in^2

SAE specifications for steel bolts for grade 8

we have

Minimum proff strength ( Sp) = 120 kpsi

Minimum tensile strength (St) = 150 Kpsi

Load Bolt (p) = external load / number of bolts = 85 / 6 = 14.17 kips

Given the following values

Fi = 75%* Sp*At = (0.75*120*0.1419 ) = 12.771 kip

Preload stress

αi = 0.75Sp = 0.75 * 120 = 90 kpsi

stiffness constant

C = \frac{Kb}{Kb + Km}  = \frac{3}{3+2} = 0.2

A) yielding factor of safety

nP = \frac{sPAt}{Cp + Fi} = \frac{120* 0.1419}{0.2*14.17 + 12.771}

nP = 77.028 / 15.605 = 4.94 ≈ 4.9

B) Determine the overload factor safety

nL = \frac{SpAt - Fi}{CP} = ( 120 * 0.1419) - 12.771 / 0.2 * 14.17

= 17.028 - 12.771 / 2.834

= 1.50

You might be interested in
The flow rate of liquid metal into the downsprue of a mold = 0.7 L/sec. The cross-sectional area at the top of the sprue = 750 m
katrin [286]

Answer:

367.43 mm²

Explanation:

Given:

Flow rate, Q = 0.7 L/s

1000 L = 1 m³ = 10⁹ mm³

thus,

1 L = 10⁶ mm³

Therefore,

Q = 0.7 × 10⁶ mm³/s

Cross-sectional area at the top of the sprue = 750 mm²

Length of the sprue = 185 mm

Now,

Velocity = \sqrt{2gh}

where,  g is the acceleration due to gravity = 9.81 m/s²

h is the height through which flow is taking place = 185 mm = 0.185

thus,

Velocity = \sqrt{2\times9.81\times0.185}

or

velocity = 1.9051 m/s = 1905.1 mm/s

Also,

Q = Area × Velocity

thus,

0.7 × 10⁶ = Area × 1905.1

or

Area = 367.43 mm²

3 0
4 years ago
Given that the company "Slate Rock and Gravel" has business locations in Granitetown and Bedrock, suppose that the company has b
kotegsom [21]

Answer:

Check the explanation

Explanation:

As Granitetown requires 5000 IP address and the starting IP address is 192.172.0.0 , we have to perform subnetting using number of hosts required

Number of IP address required by Granitetown=4000

Number of hosts bits =

2n -2= 5000

n=13 (approximately)

Number of hosts bits are 13 therefore subnet prefix =(32-13)=19

We have used 32 because IP address is of 32-bit

Subnet mask corresponding to /19 = 255.255.224.0

Starting IP address (given)= 192.172.0.0

Now to calculate last IP address of the subnet, OR operation will be performed between First IP address of the subnet and !Netmask

First IP address of subnet ( in binary) =

11000000.10101100.00000000.00000000

OR

00000000.00000000.00011111.11111111 (!Netmask)

11000000.10101100.000 11111.11111111 (result)

Converting result into decimal gives IP address 192.172.31.255 which will be the broadcast IP address of the subnet therefore

Last usable IP address = 192.172.31.254

Now, bedrock requires 2000 IP address

Therefore number of host bits are =

2n -2 =2000

n=10 (approximately)

Number of hosts bits required are 10

Therefore Netmask prefix = (32 -10) =22

Now, using the next subnet for bedrock therefore the first IP address of subnet will be 192.172.32.0

Now, similarly calculating last IP address of subnet

First IP address in binary =

11000000.10101100.00100000.00000000

OR

00000000.00000000.00000011.11111111 (!Netmask)

11000000.10101100.00100011.11111111 (result)

Now, result in decimal = 192.172.35.255

Therefore ,

Broadcast address of subnet =192.172.35.255

Last usable IP address =192.172.35.254

8 0
4 years ago
An airplane travels 1000 miles at velocity of 500 miles in every hour. solve for the time it took the plane to arrive.
alukav5142 [94]

Answer:

Time taken by airplane to cover given distance = 2 hour

Explanation:

Given:

Distance cover by airplane = 1,000 miles

Velocity of airplane = 500 miles per hour

Find:

Time taken by airplane to cover given distance

Computation:

Time taken = Distance / Velocity(Speed)

Time taken by airplane to cover given distance = Distance cover by airplane / Velocity of airplane

Time taken by airplane to cover given distance = 1,000 / 500

Time taken by airplane to cover given distance = 2 hour

7 0
3 years ago
A helical compression spring is to be made of oil-tempered wire, d, of diameter 1–mm with a spring index of C = 10. The spring i
BaLLatris [955]

Question

Determine the minimum hole diameter for the spring to operate in

Answer:

11 mm

Explanation:

Mean spring coil diameter is given from the following relationship

D=cd where C is spring index and d is the diameter of oil-tempered wire

By substitution

D=10*1 mm=10 mm

To find the outer diameter, we add the d to D hence getting the minimum hole diameter as

D_o= D+d= 10 mm+1 mm= 11 mm

5 0
3 years ago
A 40 mph wind is blowing past your house and speeds up as it flows up and over the roof. If the elevation effects are negligible
Finger [1]

The pressure at the point on the roof where the speed is 60mph is 14.66 psi

<u>Explanation:</u>

The question follows Bernoulli's equation

P1 + 1/2 ρ V1² = P2 + 1/2 ρ V2²

V1 = 40 X 5280 / 3600 = 58.7 ft/s

V2 = 60 X 5280 / 3600 = 88 ft/s

P2 = P1 + 1/2 ( 0.00238 ) [(58.7)² - (88)²]

P2 - P1 = -5.12lb/ft²

The negative pressure created tends to lift the roof.

We know,

P1 = 14.7 psi = 2116.8 lb/ft²

P2 = 2116.8 - 5.12 lb/ft²

P2 = 2111.68 lb/ft²

P2 = 14.66 psi

Therefore, the pressure at the point on the roof where the speed is 60mph is 14.66 psi

7 0
3 years ago
Other questions:
  • Does a thicker core make an electromagnet stronger?
    13·1 answer
  • The boundary layer forms the thin region near a surface where the flow is affected by frictional forces. How does this layer cha
    14·1 answer
  • Need answers for these please ​
    15·1 answer
  • An incompressible fluid flows along a 0.20-m-diameter pipe with a uniform velocity of 3 m/s. If the pressure drop between the up
    15·1 answer
  • you are given the following data set: 15, 12, 11, 13, 10, 23, 16, 18, 11, 8. find the values of the lower quartile, median, uppe
    13·1 answer
  • Show how to connect the two circuit building blocks from the previous problem to create a circuit that transforms a priority-enc
    15·1 answer
  • WILL MARK BRAINLIST I need help on this asap thanks
    15·1 answer
  • What is the flow of a charge called​
    12·1 answer
  • What are examples of Energy careers? Check all that apply. Carpenter Video Editor Electrical Power-Line Installer Printing Press
    15·2 answers
  • A 12 kg hockey puck is traveling at a velocity of 15 m/s. What is the momentum?
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!