1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
dsp73
3 years ago
13

Can you help me with this question

Mathematics
1 answer:
Brilliant_brown [7]3 years ago
6 0
V = A * h;
V = volume of the building;
h = 35 m ;
A = the area of floor plan;
A = 30 ^2 + π*15^2 - (π*15^2) / 4 => A = 900 + π*675 / 4 ≈ 
900 + 3.14*675 / 4 ≈ 900 + 529.87 ≈ 1429.87m^2
V ≈ 50045.45 m^3
You might be interested in
There are 3 consecutive integers. The sum of all the integers is equaled to 3 times the 2nd integer. What is the value of the 3
Amanda [17]
The integers would be 1, 2, and 3!
1+2+3 is equal to 6, and 2(3)=6 as well. Hope this helped :)
8 0
3 years ago
Estimate. Round to the greatest place value. Circle whether the estimate is greater then or less then the actual product.
nataly862011 [7]

Answer:

The estimate is greater then.

Step-by-step explanation:

143*2=286

286*2=572 not 6,517

4 0
3 years ago
Water is drained out of tank, shaped as an inverted right circular cone that has a radius of 16cm and a height of 8cm, at the ra
andriy [413]
Let h=height of water
Let r=radius of water surface
r/h=16/8 =2, so r=2h.
The volume of water is:
v=(1/3)×π×r²×h
=(1/3)×π×(2h)²×h
=4/3πh³
dv/dh=4πh^2
By chain rule:
dv/dt=dv/dh×dh/dt
but
dv/dt=4 
thus:
4=(4πh)×dh/dt
dh/dt=4/(4πh²)
when h=6cm we have:
dh/dt=4/(4π6²)
=0.00884 cm³/min


8 0
4 years ago
Read 2 more answers
Three workers have to do a certain job. The first worker can finish the job in 8 hours. The second worker can finish the job in
mestny [16]

Working together three workers would take 1 hour 36 minutes to finish the job

<em><u>Solution:</u></em>

Given that first worker can finish the job in 8 hours

So in one hour, first worker can do \frac{1}{8} th of the work

The second worker can finish the job in 4 hours

So in one hour, second worker can do \frac{1}{4} th of the work

The third worker can also finish the job in 4 hours

So in one hour, third worker can do \frac{1}{4} th of the work

<em><u>The three workers working together in 1 hour can do:</u></em>

\frac{1}{8} + \frac{1}{4} + \frac{1}{4} = \frac{1 + 2 + 2}{8} = \frac{5}{8}

The three worker can thus do \frac{5}{8} th of the work in one hour

Hence the three of them together can finish the work in \frac{8}{5} hours

\frac{8}{5} = 1\frac{3}{5} hours

Thus working together three workers would take 1 hour 36 minutes to finish the job

8 0
3 years ago
Add and SImplify<br> (x+2)/(x) + (x-3)/(x+2)
Jlenok [28]
(x+2)/(x) + (x-3)/(x+2)

Common denominator x(x+2)

Reduce both to common denominator:
x+2)/[x(x+2)] + (x-3)/[x(x+2)] ===> [(x+2)² + (x-3)] / [x(x+2)]
= [x²+4x+4+x-3] / [x(x+2)]
=[x²+54x+1] / [x(x+2)]
7 0
4 years ago
Other questions:
  • Triangle ADE is similar to triangle ABC. Which statement is TRUE concerning the slope of the line formed by the hypotenuse of
    8·2 answers
  • Simplify 8+3i over 4- 3i
    9·1 answer
  • What is the equation that represents the line
    5·1 answer
  • If the number of professors in a college is P and the number of students S, and there are 12 times as many students as professor
    10·2 answers
  • Find the surface area of a square pyramid whose base edge is 6cm and whose slant edge is 5cm
    8·2 answers
  • Event A : stops on an even number
    13·1 answer
  • How do u do this with answer plz
    15·2 answers
  • A 5 kg ham is sliced for sandwiches there are 125 slices how many grams are in each slice
    10·2 answers
  • Please answer the question
    7·1 answer
  • What is the value of x for the parallelogram year shown?
    11·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!