-2n + 1.8 = 3.2
Subtract 1.8 from both sides
-2n = 1.4
Divide both sides by -2
n = 1.4/-2 = 0.7/-1 = -0.7
n = -0.7
Check your work:
-2(-0.7) + 1.8 = 3.2
1.4 + 1.8 = 3.2
3.2 = 3.2
The answer is B. -0.7
Answer:
Mean track length for this rock specimen is between 10.463 and 13.537
Step-by-step explanation:
99% confidence interval for the mean track length for rock specimen can be calculated using the formula:
M±
where
- M is the average track length (12 μm) in the report
- t is the two tailed t-score in 99% confidence interval (2.977)
- s is the standard deviation of track lengths in the report (2 μm)
- N is the total number of tracks (15)
putting these numbers in the formula, we get confidence interval in 99% confidence as:
12±
=12±1.537
Therefore, mean track length for this rock specimen is between 10.463 and 13.537
Answer:
777 fewer belts
Step-by-step explanation:
288/4 = 72
72 + 15 = 87
288*3 = 864
864 - 87 = 777
Answer:abudul should have divided by 4 ,not 6
Step-by-step explanation:
Answer:
Option C would be better than the others.
Step-by-step explanation:
She wants to learn about band members from a sample of the population. Option a isn't enough because flute players aren't the only ones who should be surveyed, she needs to know about all band members. B isn't right, it isn't logical to just survey people with names starting with J or M. So, c would be just right since she's surveying 2 band members from each school so she would get information from a sample of the population and not just from her school.