
What's The Fixed Point? Well, Let's Assume X=0, this is our point.

OR

I'm unaware of the nature of the question, so here are some different ways a fixed point is found based on the merits of the question.
Answer: 120 days
Step-by-step explanation:
A can complete it in 16 days.
=100/16 =6.25%/day.
B has ten days to do it.
10% every day is equal to 100/10.
So they would each contribute 16.25 percent per day as a group.
then for six days,
16.25*6 =97.50percent
97.50% of the work has been finished, in other words.
The amount of work left is now 100-97.5 = 2.5.
C finishes up the remaining job in 3 days
3.5% in 3 days, to be exact.
Consequently, he will finish his entire project in 120 days.
[2.5 * 40 = 100 percent; 40 * 3 = 120 days]
First, you need to get the variable by itself.
Divide three by both side.
c = -7
Brainliest answer? :)
Solve for y in the first equation.
y = 4x + 6
Substitute <span>4x + 6 into the second equation.
-5x - (</span><span>4x + 6) = 21
Distribute
-5x - 4x - 6 = 21
Combine like terms
-9x = 27
Divide both sides by -9
x = -3
Substitute back into first equation
-4(-3) + y = 6
Solve for y
y = -6</span>