Cress Electronic Products manufactures components used in the automotive industry. Cress purchases parts for use in its manufact

uring operation from a variety of different suppliers. One particular supplier provides a part where the assumptions of the EOQ model are realistic. The annual demand is 5000 units, the ordering cost is $80 per order, and the annual holding cost rate is 25%. a. If the cost of the part is $20 per unit, what is the economic order quantity?
b. Assume 250 days of operation per year. If the lead time for an order is 12 days, what
is the reorder point?
c. If the lead time for the part is seven weeks (35 days), what is the reorder point?
d. What is the reorder point for part (c) if the reorder point is expressed in terms of the
inventory on hand rather than the inventory position?
Mathematics
2 answers:
rosijanka [135]3 years ago
6 0

Answer:

a. 400 unit

b. 240 unit

c. 700 unit

d. 200 unit

Step-by-step explanation:

The annual demand(D) is 5000 units

The ordering cost(S) is $80/order

The annual holding cost rate(I) is 25%

question (a) says , if the Cost of the part is $20 per unit, what is the economic order quantity?

∴ The economic order quantity  will be,

Q = (2 × D × S /IC)^(1/2)

Q= (2*5000*80 / 0.25*20)^(1/2)

Q = 160000^(1/2)

Q = 400 unit

(b)

Lead time(LT) for an order is 12 days

and 250 days of operation per year

The reorder point  will be

R = D*LT

R= 5000*(12/250)

R = 240 unit

(c) Lead time for the part is seven weeks (35 days)

R = D*LT

R= 5000*(35/250)

R = 700 unit

(d)  

In cases of long lead times, the lead-time demand and thus the reorder point may exceed the economic order quantity Q*. Therefore, the inventory position will not equal the inventory on hand when an order is placed, and the reorder point may be expressed in terms of either the inventory position or the inventory on hand.

so average inventory on hand = Q/2

= 400/2

= 200 unit

laila [671]3 years ago
3 0

Answer:

a. Economic order quantity EOQ is 400 units

b. Reorder Point ROP is 240 units

c. Reorder Point ROP is 700 units

d. Reorder Point ROP is 602 units

Step-by-step explanation:

Given Details

Annual demand(D) is 5000 units

The ordering cost(S) is $80/order

The annual holding cost rate(I) is 25% = 0.25

(a)

Cost of the part is $20 per unit

The economic order quantity EOQ

EOQ =√((2D*S)/(IC))

EOQ = √((2*5000*80)/(0.25*20))

EOQ = 400 units

(b)

Number of days of operation per year

is 250 days

Lead time (LT) for an order is 12 days

The reorder point ROP = D*LT

but LT is 12/250 = 0.048

ROP = 5000*0.048

ROP = 240 unit

(c)

Lead time (LT) for the part is seven weeks (35 days) = 35/250 = 0.14

ROP = D*LT

ROP= 5000*0.14

ROP = 700 unit

(d)

ROP if the reorder point for C above is expressed in terms of the

inventory on hand is

ROP at C which 700 units will be subtracted from annual demand of 5000 units = 4300 units

New Demand is 4300 units

ROP = D * LT at C (35 days)

ROP = 4300 * 35/250

ROP = 602 units

You might be interested in
An IV infiltrates with 330 mL remaining in the bag. It was restarted at 1015 at a rate of 30 mL/hr. What is the IV completion ti
DochEvi [55]

Answer:

11 hours

Step-by-step explanation:

I came up with this answer by dividing the IV infiltrate in the bag by the rate. This gave the completion time.

Volume of IV infiltrate = 330ML

Rate at which it was running = 30 ML/hour

The IV completion time = volume/rate

= 330 ML/30 ML

= 11 hours

Therefore the IV completion time is 11 hours.

3 0
3 years ago
Solve the equation for x<br> -2x = -32
grandymaker [24]

Answer:X=16

Step-by-step explanation:

first you divide -2 ,to -2x and also divide -32 by -2 and you get x=16

Hope this helped!!!

6 0
3 years ago
Each basketball comes in a cubic box with side lengths of 1 foot. The locker is 3 feet long, 2 feet wide, and 5 feet high. How m
LuckyWell [14K]

Answer:

30 basketballs

Step-by-step explanation:

one layer would be 3 x 2 = 6

  • to find how much you would need to cover the bottom of the locker, you would use the numbers 3 and 2, then multiply them and you get 6. You would need 6 basketballs to cover the bottom of the locker. That would be your first layer

5 layers would be 6 x 5 = 30

  • So the bottom would be filled with 6 basketballs. Now since the locker is 5 feet high multiply 6 x 5 and that would get you your total of basketballs
4 0
3 years ago
Which expression is equivalent to 16x16x16
DENIUS [597]

Answer:

16^3

Step-by-step explanation:

16 x 16 x 16 is the same thing as 16 to the 3rd power. The power is how many times you multiply the number by itself.

6 0
2 years ago
Read 2 more answers
Help Literal Equations
Rom4ik [11]
If you are trying to find x it is x=15-y
8 0
3 years ago
Other questions:
  • Please help me I really need help and its do tomorrow
    15·1 answer
  • At City Financial Bank, they have offered Haley a 7% compound interest rate. If she invests $1400 for 4 years. If they give her
    12·1 answer
  • Ps help me with this its urgent❤
    5·1 answer
  •  Which is this?
    6·1 answer
  • A six-sided number cube is rolled 350 times and the results are recorded as follows: 58 ones, 63 twos, 52 threes, 61 fours, 60 f
    11·1 answer
  • Write the ratio explain what the ratio means bottles to cans 5 can 2 bottles<br>​
    15·1 answer
  • There are 156 people taking a boating safety course. The ratio of adults to students is 9 to 4. How many adults are taking the c
    12·1 answer
  • Surface Area = <br><br><br> 96 ft2<br><br><br> 160 ft2<br><br><br> 88 ft2
    5·1 answer
  • Does America live up to its core values?
    14·2 answers
  • Given:f(x)=3x-5,find f(x+2)
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!