Answer:
d. 76.98%
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

What percentage of MBA's will have starting salaries of $34,000 to $46,000?
This is the pvalue of Z when X = 46000 subtracted by the pvalue of Z when X = 34000. So
X = 46000



has a pvalue of 0.8849
X = 34000



has a pvalue of 0.1151
0.8849 - 0.1151 = 0.7698
So the correct answer is:
d. 76.98%
Yes because it create lines that won’t hit two points (probably doesn’t make sense)
Answer:
42 - 3 = 39 Is greater than 7 is
Hope this helps, even tho that's not 50 points, but i'm cool with it, I hope you get it correct
Step-by-step explanation:
Answer:
The height of the dog house = 4 feet.
Step-by-step explanation:
Given:
The shape of the dog house is like a tent.
The slant heights of the house is 5 feet.
The bottom of the house is 6 feet across.
To find the height of the dog house at its tallest point.
Solution:
On drawing the figure of the dog house in the shape of a tent, we find out that the tallest point would be at the midpoint of the bottom of the house.
Thus, we ave a right triangle, of which one leg =
and hypotenuse = 
<em>Applying Pythagorean theorem to find the measure of the other leg which is the height of the house.</em>

Plugging in values.


Subtracting both sides by 9.


Taking square root both sides.


Thus, the height of the dog house = 4 feet.
What is the definition of volunteer?