Given the amount of water needed to fill the cement dam and the water pump rate, the time needed to fill the dam is 400 minutes or 6hours 40minutes.
Option B)6h 40min is the correct answer.
<h3>How long does it take to fill the dam?</h3>
Given that;
- Amount of water needed to fill the dam A = 30000 litres
- Pump rate r = 75 litres per minute
- Time needed to fill the dam T = ?
To determine how long it take to fill the dam, we say;
Time need = Amount of water needed ÷ Pump rate
T = A ÷ r
T = 30000 litres ÷ 75 litres/minute
T = 400 minutes
Note that; 60min = 1hrs
Hence,
T = 6hours 40minutes
Given the amount of water needed to fill the cement dam and the water pump rate, the time needed to fill the dam is 400 minutes or 6hours 40minutes.
Option B)6h 40min is the correct answer.
Learn more word problems here: brainly.com/question/2610134
#SPJ1
Answer: g(x)=9^x-7
Step-by-step explanation:
Answer:
0.0057
Step-by-step explanation:
- Narrow it down.
- The point P is between 5 * 10^-3 and and 6*10^-3
- When you go to the bottom line, P is on the 7th division from the left.
- Going from left to right increases P
- P is on a line that goes between 5 and 6. Each division is 1/10. So P is in the tenth place.
- One of the answers is 5.7 * 10^-3
- The other answer is .0057
- I really don't know which one to choose because we are given no direction. As a programmer, 0.0057 would be easier to program. I would choose it.
- If it is not correct, then 5.7 * 10^-3 is the answer.
The answer is always negative because if you multiply like signs, the answer is positive, unlike signs are always negative
Answer:
Read my explanation
Step-by-step explanation:
Since they both end with a 0, you can just cancel it out. So you'd have 484/9.
The answer to that is 53.7777777777...
So the decimal would come before the 3 and after the 7.
I hope this helped and have a good rest of your day!