The absolute value be pie or square because Pio screwed because the circumference is alsoHope this helps
the equation of a line in point-slope form is
y - b = m(x - a)
where m is the slope and (a, b) a point on the line
to calculate m use the gradient formula
m = (y₂ - y₁ ) / (x₂ - x₁ )
with (x₁, y₁ ) = (- 4, - 1) and (x₂, y₂) = (1 1/2, 2 )
m = = =
using (a, b) = (- 4, - 1), then
y + 1 = (x + 4)
Answer:
The 99% confidence interval = (126.93,157.67)
Step-by-step explanation:
The formula for Confidence Interval =
Mean ± z × Standard deviation /√n
Mean = 142. 3 mmHg
Standard deviation = 20.8 mmHg.
n = 12
Z score for 99% confidence interval = 2.56
Confidence Interval =
142.3 ± 2.56 × 20.8/√12
142.3 ± 2.56 × 6.0044427996
142.3 ± 15.371373567
Confidence Interval
= 142.3 - 15.371373567
= 126.92862643
≈ 126.93
142.3 + 15.371373567
= 157.67137357
≈ 157.67
Therefore, the 99% confidence interval = (126.93,157.67)
Answer:
I believe the answer is A.
Step-by-step explanation:
Answer:
The length of the mosquito in the picture is 117.6 mm.
Step-by-step explanation:
This question can be solved using a rule of three.
The real size of the mosquito is 16 mm, which is 100% = 1.
In the picture, the size is magnified 635%, so it is 100+635 = 735% = 7.35. So
16mm - 1
x mm - 7.35
x = 7.35*16 = 117.6
The length of the mosquito in the picture is 117.6 mm.