<span>38 - 7r = 3(6 - 4r)
38 - 7r = 18 - 12r
-7r + 12r = 18 - 38
5r = -20
r = -4</span>
8.75-4.85= 3.90= cost of 6 bananas
3.9/6=0.65= cost of one banana
.65*4=2.60= cost of 4 bananas
4.85-2.60= 2.25= cost of 3 apples
2.25/3=.75= cost of an apple
28x + 44y = 964.40
21x + 33y = 723.30
Let's multiply the first equation by 4 and the second by -4
84x + 176y = 3857.6
-84x - 132y = -2893.2
Add the equations together.
0 + 44y = 964.4
Simplify
44y = 964.4
Divide both sides by 44
y = 964.4/44
Since we have the value of y, let's plug 964.4/44 into y for the first equation.
28x + 44(964.4/44) = 964.40
Simplify the left side
28x + 964.4 = 964.4
Subtract 964.4 from both sides
28x = 0
Divide both sides by 0
x = 0
In conclusion,
y = 964.4/44
x = 0
Answer:
Step-by-step explanation:
<em>Time</em><em> </em>is the dependent variable, so you set your function equal to <em>s</em>. Then, the correlation of the graph has a <em>rate</em><em> </em><em>of</em><em> </em><em>change</em><em> </em>[<em>slope</em>] from the y-intercept of so we choose this answer choice.
I am joyous to assist you anytime.
Answer: It would take 9 hours for 4 painters to paint 720 feet of fence.
Step-by-step explanation:
1.) Calculate the time needed to paint the 720 ft fence with 2 painters.
a.) Divide 720 by 280 to get how many times greater 720 is than 280.
720 / 280 ≈ 2.57
b.) Multiply the time needed to paint the 280 ft fence with 2 painters by 2.57.
7 * 2.57 ≈ 18
2.) Calculate the time needed to paint the 720 ft fence with 4 painters.
a.) Assuming that each painter paints the same amount of fence, divide the time in half, as 4 painters is double the original amount, so it would take half of the time.
18 / 2 = 9