Answer:
m = 0
Step-by-step explanation:
AB has a slope of y2 - y1 / x2 - x1 so -8-5/3-3 so -13/0 = undefined so it is a vertical line, so any line that is horizontal will be perpendicular to it, so horizontal lines have a zero slope
Answer is 187.06 and the work is in the attached picture.
Answer:
The cutoff sales level is 10.7436 millions of dollars
Step-by-step explanation:
Problems of normally distributed samples are solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this problem, we have that:

15th percentile:
X when Z has a pvalue of 0.15. So X when Z = -1.047.




The cutoff sales level is 10.7436 millions of dollars
The answer is A because the same rule applies