Answer:
(a) 
(b)The boiling point of water in Celsius scale is 100°C.
(c)The setting in Celsius scale is 26.7°C.
Step-by-step explanation:
Given that,the formula is
......(1)
(a)
Given that,

[ subtracting 32 from both sides]


......(2) [Multiplying
]

(b)
Given that, the boiling point of water is 212°F.
Putting F=212 in equation (2)




The boiling point of water is 100°C.
(c)
Given that, a house thermostat is set at 80 degree.
Putting F=80 in equation (2)



The setting in Celsius scale is 26.7°C.
Answer: 0.58 m^3
Step-by-step explanation:
V= 2600 / 1500
= 0.58 m^3
Answer:
$193.50
Step-by-step explanation:
start by multiplying 240 by .25 (25%) to find out how much is 25% of 240. this equals 60.
then, subtract $60 from $240. equals 180.
next, to add the sales tax, multiply 180 by 0.075 (7.5%) this is $13.50.
lastly, add the tax, which is $13.50, to the suit's sale price, which is $180.
180+13.5= $193.50
Answer:
f(3) = - 18
Step-by-step explanation:
To evaluate f(3) , substitute x = 3 into f(x) , that is
f(3) = - 4(3 + 1) - 2 = - 4(4) - 2 = - 16 - 2 = - 18
Answer:
Sharika needs 2.5 days to finish the remaining work
Step-by-step explanation:
Sharika can do a work in 6 days palkey can do it in 8 days
Then the amount of work sharika can do in 1 day = 1/6
And the amount of work palkey can do in 1 day = 1/8
The amount of work both of them can do together in 1 day = 1/6 + 1/8
= 7/24
The amount of work both of them can do together in 2 day = (2× 7/24)
= 7/12
Since Palkey left the work,the amount of
work remaining for Sharika to do alone = (1 - 7/12 )
= 5/12
The number of days Sharika take to finish the remainig work. = (5/12 ÷ 1/6 )
= 5/2 days
Therefore, Sharika needs 2.5 days to finish the remaining work.