1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Alona [7]
4 years ago
10

1:320000 what is the actual distance represented by 1 cm give your answer in km

Mathematics
2 answers:
Musya8 [376]4 years ago
7 0

Answer:

1:3.2km

Step-by-step explanation:

-Given the scale 1:320000 all in centimeters.

-We need to convert the represented cm dimension into kilometers.

#We know that 1cm equals 0.00001 km.

We therefore multiplied the represented dimension by 0.00001 km:

=320000\times 0.00001 km\\\\=3.2 \ km

Hence the scale i s 1cm represents 3.2km thus 1:3.2km

saw5 [17]4 years ago
7 0

Answer:

1:3.2km

Step-by-step explanation:

-Given the scale 1:320000 all in centimeters.

-We need to convert the represented cm dimension into kilometers.

#We know that 1cm equals 0.00001 km.

We therefore multiplied the represented dimension by 0.00001 km:

Hence the scale i s 1cm represents 3.2km thus 1:3.2km

Read more on Brainly.com - brainly.com/question/15270846#readmore

You might be interested in
A new building in the shape of a square pyramid is to be constructed. The slant height will be five times the side length of the
Temka [501]

The area of the square pyramid building is the amount of space on it

The maximum base length of the building is 67.42 cm

<h3>How to determine the maximum side length?</h3>

The given parameters are:

Base = b

Slant height (l) = 5b

The lateral surface area is calculated using:

L = 2bl

So, we have:

L = 2 * b * 5b

Evaluate the product

L = 10b^2

The total surface area is calculated using:

T = L + b^2

So, we have:

T = 10b^2 + b^2

Evaluate the sum

T = 11b^2

The maximum surface area is 50,000 square feet

So, we have:

11b^2 = 50000

Divide both sides by 11

b^2 = 50000/11

Take the square root of both sides

b = 67.42

Hence, the maximum base length of the building is 67.42 cm

Read more about square pyramids at:

brainly.com/question/27226486

3 0
3 years ago
Read 2 more answers
Determine the domain and range of the graph.
nirvana33 [79]

Answer:

Domain [-4,4]

Range [-2,2]

Step-by-step explanation:

The domain is the x-values of the graph and the range in the y-values. When writing domain and range it should be from least to greatest. So to find the domain find the lowest x-value on the graph and then the highest. Next, do the same for y-values. Finally, either surround each value with parentheses or bracket, the difference is that brackets mean that value is included, while parentheses mean that value is not actually on the graph.

In this case, the lowest x-value is -4 and the highest is 4, both values are included as signified by the closed circles, therefore the domain is [-4,4]. The lowest y value is -2 and the highest is 2, both are included, therefore the range is [-2,2].

4 0
3 years ago
Solve the system of equations by substitution.
german

Answer:A

Step-by-step explanation: Hope this helped. Let me know if it did.

5 0
2 years ago
Explain to me in words how you would find the slope of this line
vekshin1

Answer:

Step-by-step explanation:

go from one point to the other. From the left point to the right point you are running across (to the right) three times. Then you are ¨rising¨ (going down) once. going to the right is positive. If you are going down its negative. Vise versa. The formula is Rise/Run. your answer would be -1/3. the one is negative because it went down.Then divide it and you have -0.333. I hope I helped!

8 0
3 years ago
The cost, £C, of hiring a lorry to travel n miles is given by
zysi [14]
Part A:
C= a + bn

Make the two equations out of the words:
82 = a + b100 * 2.5     = 205 = a + b250
157 = a+ b250

Subtract the two,
205 = a + b250
- ( 157 = a + b250)
48 = a

Find b by substituting in a:
82 = a + b100
82 = 48 + b100
34 = b100
b = 0.34
Answer for part a: a = 48 , b = 0.34

Part B:
C = a +bn    <- when n = 300   , put in a and b, then solve
C = 48 + 0.34(300)
C = 48 + 102
C = 150

Cost when hiring a lorry to travel 300 miles is 150 pounds
7 0
3 years ago
Read 2 more answers
Other questions:
  • The linear relationship represented by the table has an initial value of 88 and a rate of change -6. Complete the table.
    7·1 answer
  • There are 3 different roads from city a to city b and 2 different roads from city b to city
    14·1 answer
  • A ball is thrown in the air from a height of 3 m with an initial velocity of 12 m/s. To the nearest tenth of a second, how long
    8·1 answer
  • 11. Find the first, fourth, and tenth terms of the arithmetic sequence described by the given rule.
    15·1 answer
  • 5(9-4)2-32 the random 2s are supposed to be squared thank you
    10·1 answer
  • &gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;&gt;
    7·1 answer
  • Can someone help me get the correct answer
    12·2 answers
  • A rope tied from a tent pole to a take in the ground forms 55 degrees angle with the ground. The pole is 3 feet from the stake,
    5·1 answer
  • How many 5mm slices of bread can be cut from a loaf that is 30cm long?
    7·2 answers
  • Can someone help me?
    14·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!