A week is 7 days.
7 days + 3 days = 10 total days.
12 cans per day x 10 days = 120 total cans.
120 cans x 3 liters and 4 ounces = 360 liters and 480 ounces.
480 ounces = 14.195 liters.
360 + 14.195 = 374.195 liters total paint. ( 374 liters and 6.7 ounces)
Round the answer as needed.
I think the answer is 6 I’m not sure tho
1) 6*10=60, 6*7=42/2=21, 21+60=81
2) 12*12=144, 12*12=144*3.14=452.16/2=226.08, 144+226.08=370.08
3) 14*5=70, 5*10=50, 70+50=120 (maybe)
4) 6*5=30/2=15, 4*3=12/2=6,15+6=21
5) 6*6=36*3.14=113.04/2=56.52, 5*5=25*3.14=78.5/2=39.25, 56.52+39.25=95.77
if right then give brainliest plz
I’m veryyy confused can yu show a pic
Answer:
The answer should be 25.
Step-by-step explanation:
Since we can rule out 25.4 for being too high, and 22 for being too low, the answer must be 25