Answer:
The answer is k = 4.
Step-by-step explanation:
Given:
Y = 8 and X = 2.
Now, to solve direct variation.
direct with .
Now, using equation to solve direct variation:
Dividing both sides by 2 we get:
.
Therefore, the answer is k = 4.
3.1 as a decimal. And it as a mixed number wait a sec.......3 1/10
Hope I could help! :)
Answer:
Right Scalene Triangle
Step-by-step explanation:
Answer:
-3
Step-by-step explanation:
-7 + 4 = -3
Answer: 1 hour 20 minutes
Step-by-step explanation:
Given : The old machine could shred a truckload of paper in 4 hours.
Rate of work done by old machine =
The new machine could shred the same truckload in 2 hours.
Rate of work done by new machine =
Let 't' be the time taken by both of them working together , then we have the following equation:-
Since 1 hour = 60 minutes
Then,
Hence, it will take 1 hour 20 minutes to shred the same truckload of paper if Ron runs both shredders at the same time.