Answer:
Step-by-step explanation:
In the morning he works four hours and 15 minutes and in the afternoon he works four hours and 15 minutes for a total of eight hours and 30 minutes. 30 minutes is 1/2 of an hour so he works for a total of 8 1/2 hours. Multiply this by his hourly rate which is $15 and this gives you $127.50
15 x 8.5 = 127.5
Complete question :
Leah is creating satin bows for a wedding. From a 15-meter-long ribbon, she first cuts a piece 3 4/9 meters long. Then she cuts a piece 6 5/9 meters long from the remaining ribbon. How much ribbon does Leah have left?
Answer:
5 m
Step-by-step explanation:
Total ribbon cut :
3 4/9 + 6 5/9 =
31/9 + 59/9
= 90 /9
= 10 meters
Total Length of ribbon = 15 m
Ribbon left :
15 - 10 = 5 m
Uh, i think this one is "two people", even though a 16 inch pizza is, in my opinion, more than enough. sorry if incorrect.
The total cost is $698.75 if the painter works for 30.25 hours.