1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
VladimirAG [237]
3 years ago
13

James is in an art gallery when Mitch, who has no special art expertise, points to a painting and says,"That artist is so good.

That piece will be worth a fortune in a few years!" James buys the painting, which does not turn out to be valuable. James tries to return the painting and recover his purchase price. A court will:_____________.
a) order the art gallery to pay James the full purchase price.
b) order Mitch to pay James the full purchase price.
c) enforce the contract between James and the art gallery.
d) enforce the contract between James and the art gallery, but order Mitch to pay James the full purchase price.
Social Studies
1 answer:
Fiesta28 [93]3 years ago
7 0

Answer:

<em>The correct option is C)  enforce the contract between James and the art gallery.</em>

Explanation:

John bought the painting after listening from another person that the painting might be of great value. In such aspect, a court will never allow to recover his purchase price as the other person's involvement did not have anything to do with Jame and the purchase he made from the art gallery. Mitch did not force James to buy the painting hence, under these circumstances James is only responsible for the purchase which he made.

You might be interested in
The gravitational force acting on an object is also called the object's _______.
Llana [10]
The Correct Answer Is B. Weight
5 0
3 years ago
Read 2 more answers
Why is the Upper Tamakoshi Hydro Project called as a project of National Pride? in which sectors of national development are dir
sergejj [24]

Explanation:

The Upper Tamakoshi hydroelectric power station is a 456MW run-of-the-river project under construction on the Tamakoshi River in the Dolakha District, approximately 200km away from Kathmandu, Nepal.

Construction on the Upper Tamakoshi hydropower project was started in 2011 and was expected to be completed within six years. The project’s progress was, however, hampered due to an earthquake in April 2015. The facility is currently scheduled for commissioning by the end of 2019.

The developer and operator of the project is Upper Tamakoshi Hydropower Limited, an autonomous company established by Nepal Electricity Authority (NEA) in March 2007.

The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.

Upper Tamakoshi hydropower plant make-up

Upper Tamakoshi comprises a 22m-high and 60m-long concrete dam, two 225m-long de-sanding basins, an 8.4km-long headrace tunnel with 32.14m² of cross-sectional area, and an underground powerhouse (142m-long, 13m-wide, and 25m-high) equipped with six Pelton turbine units.

“The Upper Tamakoshi hydropower station is expected to produce 2,281GWh of electricity a year.”

The gross head height of the dam is 822m. Design flood and discharge capacities for the facility will be 885m³/s and 66m³/s, respectively.

Live storage capacity of the dam will be 1.2 million cubic metres. The 2.9km-long tailrace tunnel of the project will have a cross-sectional area of 35m².

Transmission and power purchase agreement

The power generated by the Upper Tamakoshi hydropower plant will be fed into the national grid through a 49km-long double circuit 220kV transmission line between Gongar and the Khimti power station.

The Nepal Electricity Authority (NEA) and Upper Tamakoshi Hydropower Limited signed a draft power purchase agreement (PPA) for the project in 2011. The NEA agreed to purchase the power output of the plant at a yearly average rate of NPR3.50 a unit.

Contractors involved

Norconsult and Lahmeyer provided detailed project design, construction management and monitoring services for the project.

The civil works contract for the project was awarded to Sinohydro Corporation. Andritz Hydro was awarded the contract for the design, manufacturing, and supply of electromechanical equipment, including turbines and generators for the project.

KEC International was contracted for the supply and erection of transmission lines as well as the substation.

Texmaco, an engineering and infrastructure company based in India, was engaged for the hydro-mechanical works for the project.

Financing

The total construction cost of the project was estimated to be NPR35.29bn ($441m) in 2011. Loans were extended by Nepal’s Employees’ Provident Fund ($131.6m), Nepal Telecom ($78.97m), Citizen Investment Trust ($26.32m), and Rastriya Beema Sansthan (RBS, $26.32m) to finance the project.

The Government of Nepal committed to providing a loan of up to NPR11.08bn ($145.8m) for the project.

The project cost has been reportedly escalated by $41.8m due to the delay and disruption caused by the 2015 earthquake.

Related Projects



Balaoi & Caunayan Wind Farm, Ilocos Norte, Phillippines

The Balaoi & Caunayan Wind Farm is an onshore wind farm project under construction by AC Energy in partnership with…

10 Jun 2021



Mutriku Wave Energy Plant

The Mutriku wave energy plant was officially commissioned by Spanish utility Ente Vasco de la Energía (EVE) in the Basque…

07 Jun 2021



Mutkalampi Wind Farm, Central and Northern Ostrobothnia, Finland

Mutkalampi is a proposed 404MW wind farm to be built in Finland by French renewable energy developer Neoen and Prokon…

04 Jun 2021



Rabigh-2 Combined-Cycle Power Plant

The 2,060MW combined-cycle Rabigh-2 independent power project (IPP) is located next to the 1,024MW Rabigh-1 power plant, 130km north of…

04 Jun 2021

Join Our Newsletter

Energy news and in-depth feature articles on the latest energy provider deals, energy innovations and trends in renewables, solar power, offshore wind, hydropower, coal and nuclear power

Receive our newsletter

Sign up to our e-Newsletter here

About us

Editorial Approach

Contact Us

Privacy Policy

Terms and Conditions

© Copyright Verdict Media Limited 2021

Powered by 

We use cookies to ensure that we give you the 

6 0
3 years ago
.. . <br> . ... .. . . .. . .. ... ...... ... ........ . . ..
Misha Larkins [42]

Answer:

Yes

Explanation:

7 0
2 years ago
Find the answer please​
Ipatiy [6.2K]

Answer: Heres a diagram I found! I'm not sure if It'll help but I hope it does^^

Explanation:

4 0
2 years ago
At ________ years of age, romantic relations are characterized by strong emotional bonds more closely resembling those in adult
masha68 [24]
At forty years old romantic relations are characterized by strong emotions.
3 0
3 years ago
Other questions:
  • What is one major similarity between local and federal elections?
    10·1 answer
  • In early civilizations, farming was relied upon to produce surpluses. Farmers were expected to get enough food to sustain the ci
    10·1 answer
  • An effective handout can help audience members remember your message. true
    13·1 answer
  • Montel, a white university student, is on academic probation for poor grades. Ever since he receivednotice of his probation, Mon
    11·1 answer
  • Is Psychology a science ?
    6·2 answers
  • Which religion does about half the population of the Democratic Republic of the Congo follow.
    11·2 answers
  • What event prompted the first continental congress
    13·1 answer
  • Perception management, which often is thought of as media manipulation, is primarily seen in use by the military in information
    13·1 answer
  • How do the legal remedies differ for the obligee in the event of a breach of contract of the promise arrived at through accord a
    12·1 answer
  • Critics contend that many of the products marketed to this group are unnecessary and that the communications are too often explo
    7·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!