1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
murzikaleks [220]
3 years ago
7

Woody and Jen were paid $60 to paint the garage. Jim started at 8 a.M. And Woody didn't arrive until 10 a.M. The work was comple

ted at 2 p.M. What is Jim's fair share of the earning.
Mathematics
1 answer:
Dennis_Churaev [7]3 years ago
8 0

Answer:

$36

Step-by-step explanation:

Jim worked from 8am - 2 pm , which is 6 hours

Woody worked form 10am - 2pm, which is 4 hours

If we take the total time (4+6 = 10) and divide the amount they got, we have:

$60/10 = $6 per hour worked

Since Jim worked 6 hours, he will be paid 6 * 6 = $36

The rest, 60 - 36 = $24 would be paid to Woody (he worked less).

Jim's fair share of earning is $36

You might be interested in
40 pts PLEASE HELP ILL GIVE BRAINLIESTS <br> A. -3 <br> B. -1/3<br> C. 1/3<br> D. 3
Licemer1 [7]
<h3>A is the answer EEEE</h3>

5 0
3 years ago
Solve.<br> |2x - 12|+ 8 = 8
Andrews [41]

Answer:

x=6

Step-by-step explanation:

6 0
3 years ago
Tell whether point (0,-12) is an x - intercept Or a Y intercept
hjlf

The given point is (0,-12).

It is required to tell whether the point is an x-intercept or a y-intercept.

Recall that the first coordinate of a coordinate point represents the x-coordinate, while the second coordinate represents the y-coordinate.

The x-intercept is the point where the y-coordinate is zero.

The y-intercept is the point where the x-coordinate is zero.

Notice that the given point has an x-coordinate of zero; this means that the given point is a y-intercept.

The point is a y-intercept.

5 0
1 year ago
Read 2 more answers
Recall that a reinforcement beam will extend from one strut to the other when the two struts are 2 feet apart. Algebraically det
Karo-lina-s [1.5K]

Answer:

Here is the full question:

Another plan to secure the roller coaster involves placing two concrete struts on either side of the center of the leg of the roller coaster to add reinforcement against southerly winds in the region. Again, using the center of the half-circle as the origin, the struts are modeled by the equations  and . A vertical reinforcement beam will extend from one strut to the other when the two cables are 2 feet apart.

Graph the two struts on the model of the roller coaster. Take a screenshot of your graph and paste the image below, or sketch a graph by hand.

Recall that a reinforcement beam will extend from one strut to the other when the two struts are 2 feet apart.

(a) Algebraically determine the x -value of where the beam should be placed.

(b) Explain where to place the beam

Step-by-step explanation:

Find attached the graphing calculator.

(a) The x-value where the beam should be placed is x = -4

(b) The beam should be placed directly above 4 feet from the center.

4 0
2 years ago
Question 3 (Essay Worth 10 points)
elena-14-01-66 [18.8K]

It's not an accurate value for the data based on the scatter plot, r = 0.01 is not an accurate value for this data, because 0.01 means practically no correlation, while the points on the graph are moderately correlated

<h3>How to illustrate the information?</h3>

1. Part A:

Since the points in the scatter plot shows a moderated upward trend, you must expect a correlation coefficient close to ± 0.5. A correlation coefficient of 0.01 is too close to 0, which would mean that the points are almost not correlated at all.

The correlation coefficients, r, measure the strength of the correlation of two variables and they can have values from - 1 to  1.

Here, r = - 1 is a perfect negative correlation as the points will adjust perfectly to a line with a negative slope.

r =  + 1 is a perfect positive correlation: the points will adjust perfectly to a line with a positive slope.

r = 0 means that the variables are not correlated at all.

Hence, the closer to zero, the worse the correlation is, and that is what r = 0.01 means, but the graph shows another thing.

Therefore, the calculated value of r = 0.01 is not accurate for this scatter plot.

2. Part B.

A causal relationship means that the explanatory variable (the independent variable) is the cause of the dependent variable.

Hence, you must find a reasonable variable that can be the cause of the number of strawberries picked.

Thus, the scenario could be:

Amount of rainfall in mm (x)         Number of strawberries picked (y)

      100                                                     20

        50                                                     40

        25                                                     80

        12.5                                                  160

        6.25                                                 320

The amount of rainfall is the cause of the number of strawberries picked, and you could find a model that relates both variables.

Learn more about scatter plot on:

brainly.com/question/6592115

#SPJ1

3 0
1 year ago
Other questions:
  • Choose all of the equations that graph as an increasing function.
    14·1 answer
  • WILL MARK BRAINLIEST!!!
    10·1 answer
  • Can anybody help me with this problem?
    15·1 answer
  • The perimeter of a rectangular garden is 292 feet. If the width of the garden is 67 feet, what is its length?
    14·2 answers
  • A sloth moves 5 meters in 2 minutes.
    6·2 answers
  • Help with number 35 plz and thank you ☺️ 16 points
    6·2 answers
  • Help pleaseeee I need the answer ???
    6·1 answer
  • Please answer number 4 please
    11·1 answer
  • Solve the equation 2x²-x=0
    10·2 answers
  • Determine if they following is systems of equations?<br> y = 3x + 2<br> y = 7x -10
    8·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!