1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Drupady [299]
3 years ago
5

In which slot is a video card most commonly installed within a laptop?

Computers and Technology
1 answer:
IgorLugansk [536]3 years ago
7 0

Answer:

<u>PCIe</u> is used for video card installation on Laptop.

Explanation:

Good quality applications, videos and games required graphics card for better results. These card can be installed on laptops, that required some ports.

PCI-e is a slot, that is used in laptop for video or graphic card interface. Video card or graphic card is used to enable high quality video or graphics on Laptop.

PCI- E stand for Peripheral Component Interconnect Express. It work as serial communication interface for high speed device.

You might be interested in
Linda has written a program that works well on various operating systems, but she needs to increase the readability of the progr
Naddika [18.5K]
Efficiency because if you don't have very good efficiency then somebody can't really read it so they won't know what it's saying.
5 0
4 years ago
___ Jacking is a crime that takes place when a hacker misdirects URL to a different site. The Link Itself Looks Safe, But the us
const2013 [10]

Answer: Web Jacking

Here, the hacker takes control of a web site fraudulently. He may change the content of the original site or even redirect the user to another fake similar looking page controlled by him.


If you have any other questions about computers or even hacking hit me up because I know a lot about computers

6 0
3 years ago
Hurry asap it’s times
Eddi Din [679]

Answer:

C and B.

Explanation:

6 0
3 years ago
Different project management steps are initiating, planning, executing, monitoring and controlling, and closing a project. Which
ser-zykov [4K]

Answer:

All steps of project management until the closure of the project are very critical and important for the success of the project.

Explanation:

The steps that are very critical and important for the success of the project.

Initiation:

This is a very beginning step of any project in the project management practices. In this step, mainly, project feasibility is carried out and drafted. at this step, management takes decisions that this project would be profitable or not for the organization. If proper measure and future prediction do not measure properly then this stage would affect the project success criteria. Because, if the base of any project is built on the wrong steps and measures, will lead to failure. At this stage, management takes the decision based on a feasibility document and business case document to ensure if it feasible or profitable to the organization.

Planning:

This is a very crucial step of project planning, and mistakes in this stage will lead the project toward failure. after receiving the green signal at the initiation stage, the proper project plan is carried out in a documented form. This project plan will guide the project manager and all stakeholders of the project in making the project successful. So, a well-written project plan is very critical and important for project success than any other phase of project management. Because the project plan gives the direction to the team to carried out the project execution process smoothly, it helps in handling risk and mitigation strategies to solve the risk, finance management, task management and in achieving timely deliverables.

Execution:

The planning phase and execution phase are most commonly associated with project management. This phase of project management is all about building deliverables and ensure timely delivery to customers for their satisfaction.  Team leader and/or project manager make this happen by allocating the required resources to develop the deliverables and keeping team members focus on their assigned tasks. This phase relies on the project  planning phase.

Monitoring and Controlling:

Monitoring and controlling are sometimes combined with the execution phase of the project because they often occur at the same time and carried out parallel to each other. At this stage, team performance, progress, and other project-related matrices are carried out to track their own progress. In this stage, key performance indicators are calculated, track variation from allocated resources such as cost and time, etc. This stage is important for project success, because if you don't deliver the quality and timely work then you may linger the project that directly affects the project cost and time.

Closure:

The team closes the project as they finished the project and customers/stakeholders approve the project output i.e product and then release the resources. This step is not crucial for project success as other all of the previous stages. but at this stage, effective communication, document finalization, and lesson learned document are required.

6 0
4 years ago
What is are the html tags plss anyone​
sineoko [7]

Answer:

Each tag starts with a tag opener (a less than sign) and ends with a tag closer (a greater than sign).

Explanation:

Each tag starts with a tag opener (a less than sign) and ends with a tag closer (a greater than sign). Many tags have corresponding closing tags which identical except for a slash after the tag opener. (For example, the TITLE tag).

Some tags take parameters, called attributes. The attributes are given after the tag, separated by spaces. Certain attributes have an effect simply by their presence, others are followed by an equals sign and a value. (See the Anchor tag, for example). The names of tags and attributes are not case sensitive: they may be in lower, upper, or mixed case with exactly the same meaning. (In this document they are generally represented in upper case.)

Currently HTML documents are transmitted without the normal SGML framing tags, but if these are included parsers will ignore them.

7 0
3 years ago
Other questions:
  • James, a technician, is tasked to remove the dust inside of a desktop computer.
    7·1 answer
  • Which of these is a biotic factor in an aquatic ecosystem?
    10·1 answer
  • Jim works the parts counter for a busy car dealership. When answering the phone, Jim often has trouble answering the customer's
    6·1 answer
  • Attempting to determine a password that is not known to the attacker is often called ____.
    13·1 answer
  • The last step on Kotter’s Eight-Step Change Model is to anchor the changes in corporate culture; to make anything stick, it must
    14·1 answer
  • If the force of gravity _ then the weight of an object will _
    8·2 answers
  • The endocrine system is composed of many parts of the body.<br> a)True<br> b)False
    11·2 answers
  • Whers the main characteristic of a Peer-to-peer (P2P) network?
    14·1 answer
  • Write a recursive function using pseudocode or C/C++.
    8·1 answer
  • A maxillary partial denture will have a ____ connector, and the mandibular partial denture will have a ____ connector.
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!