<h2>Answer:</h2>
Truck drivers probably can't see your vehicle if you cannot see them in their side mirror
<h2>Explanation:</h2>
In driving terminology there is a term called the bind spot. Blind spot is the area where the driver is not able to see the vehicle behind him and this area is present just behind the truck and very close to the gates of the car. Since trucks do not have the rare mirror therefore if a car is present in their blind spot they wont be able to see it. The driver behind the truck can spot it if he does not see the truck driver in the side mirror of the truck.
Answer:
- def getLargest(number_list):
- new_list = []
-
- for x in number_list:
- if(isinstance(x, int)):
- new_list.append(x)
-
- largest = max(new_list)
-
- return largest
Explanation:
Firstly, create a function <em>getLargest()</em> that take one input parameter, <em>number_list</em>.
The function will filter out the float type number from the list by using <em>isinstance() </em>method (Line 5). This method will check if a current x value is an integer. If so, the x value will be added to <em>new_list</em>.
Next, use Python built-in <em>max</em> function to get the largest integer from the <em>new_list </em>and return it as output.
Answer:
The correct answer is C) With respect to PERT and CPM, slack is the amount of time a task may be delayed without changing the overall project completion time.
Explanation:
The CPM (Critical Path Method) method is frequently used in the development and control of projects whose tasks have a fixed duration while the PERT (Program Evaluation and Review Techniques) method is a set of techniques with the same purpose but that allows to work with tasks with estimated probability duration but not deterministic.
Both methods are based on developing a complete scheme that includes all the tasks of a project linked to each other according to their sequence, determining the duration and analyzing different ways of reconfiguring the task planning to optimize the use of the resources of according to the general objectives of the project.
There are tasks that to start performing them must have been completed one or more previous tasks. The overall duration of the project is determined by the Critical Path, which is the sequence of tasks of greater duration. The tasks belonging to the critical path have to be carried out with special care because delays in them would cause delays in the total achievement of the project. That is why these tasks have no slack.
The rest of the tasks have some slack, which is determined by the time that a previous task can be delayed without delaying the total time of completion of the project, that is, not exceeding the duration determined by the critical path.
That is that why we say that the <em>slack</em><em> is the amount of time a task may be delayed without changing the overall project completion time</em>.
Answer:
A. They are typically played in doors.
Explanation:
Most logical answer
Answer:
n! = n*(n-1)*(n-2)*(n-3)* ... *2*1
Explanation:
The factorial operator is simply a mathematical expression of the product of a stated integer and all integers below that number down to 1. Consider these following examples:
4! = 4 * 3 * 2 * 1
4! = 12 * 2 * 1
4! = 24
6! = 6 * 5 * 4 * 3 * 2 * 1
6! = 30 * 4 * 3 * 2 * 1
6! = 120 * 3 * 2 * 1
6! = 360 * 2 * 1
6! = 720
So, the factorial of n would follow the same as such:
n! = n * (n-1) * (n-2) * ... * 2 * 1
Cheers.