Solving 4=2x is using the division property because in order to get the last portion of that answer u have to divide both sides by 2x to get x by itself
For example
4=2x to get x by itself you have to divide both sides by 2x
And your final answer would be
x is equal to 2 (x=2)
<h2><u>Solu</u><u>tion</u><u>:</u></h2>
360° ÷ 10 ÷ 2 = 18°
So the length of the decagon side is:
10 × tan18° × 2 = 20 × tan18°
The area is: ½ × 20 × tan18° × 10 × 10 = 1000 × tan18°
≈ 324.9
.: <u>3</u><u>2</u><u>4</u><u>.</u><u>9</u> is the final answer.
<em>I</em><em> </em><em>h</em><em>ope</em><em> </em><em>this</em><em> helps</em><em>. </em>
Answer:
5.95
Step-by-step explanation:
that is because 96 is rounded too 100
so its 5.9500 = 5.95
The initial fee of $50 is essentially the y intercept because this is the value when x = 0 (x is the number of labor-hours). So b = 50.
The slope is m = 30 because each increase of 1 hour leads to the cost bumping up by 30 dollars. In other words, slope = rise/run = (change in cost)/(change in hours) = 30/1
So we plug m = 30 and b = 50 into the y = mx+b formula to get y = 30x+50
Replace y with f(x) to get f(x) = 30x+50
The linear function for the cost is f(x) = 30x+50
Note: Some books may use other letters (instead of x and f(x)), but the idea is still the same
Once you know the cost function, you replace x with 4.5 to find the amount it will cost to have a painter work for 4.5 hours.
f(x) = 30x+50
f(4.5) = 30*4.5+50
f(4.5) = 135+50
f(4.5) = 185
It will cost 185 dollars to have the painter work for 4.5 hours
Answer:
h(x)
h(x)
f(x) g(x) h(x)
Step-by-step explanation:
Edge 2020
~theLocoCoco