9514 1404 393
Answer:
c. x = 7-t; y = -1/(t -7)
Step-by-step explanation:
To find the parametric equation for x, use the equation for t and solve for x.
t = 7-x
x = 7 -t . . . . . . add x-t to both sides
__
To find the parametric equation for y, substitute the equation for x.
y = 1/x
y = 1/(7-t)
To make this match the available choices, we need to multiply numerator and denominator by -1.
y = -1/(t -7)
The parametric equations are ...
x = 7 -t; y = -1/(t -7) . . . . . . matches choice C
Answer:
<h3>
This means that about 21 level truck loads are necessary to remove all dirts.</h3>
Step-by-step explanation:
To get the number of level truck loads needed to remove all the dirts in the house, first we need to calculate volume of the truck and the house.
Volume of truck = Length * Breadth * Height
If the truck is 5.0 for the length 2.0 for the height 3.0 for the side base;
Volume of the truck = 5*2*3
Volume of truck = 30
For the house;
Volume of house = Length * Breadth * Height
If the house is 4.0 for the height 14.5 for the length and 11.0 for the side base, then
Volume of the house = 4*14.5*11 = 638
Number of level truck loads needed to remove all the dirts = Volume of house/Volume of the truck = 638/30 ≈ 21.3
This means that about 21 level truck loads are necessary to remove all dirts.
Answer:
11 hours
Step-by-step explanation:
The number of machines working in the factory = 6 machines
Decreasing it by a factor of 2 =
6 ÷ 2 = 3 machines.
Hence:
If 6 machines complete a big order = 22 hours
3 machines = x hours
Cross Multiply
6 machines × x hours = 22 hours × 3 machines
x hours = 22 hours × 3/6
= 66/6
x = 11 hours
Therefoee, it would take 11 hours to fill the order if the number of working machines decreased by factor of 2.
I agree. All real numbers except -1.
Common factors are 1,2,4 so the greatest one would be 4