B. format because changing the brightness of the photo is changing its default format
C. schedule.
Outlook adds your appointment to your schedule folder.
Answer:
Bike Frame Flow Time
The value-added percentage of the flow time for this bike frame is:
= 46.
Explanation:
a) Data and Calculations:
Bike Frame Flow Time:
Setup time = 7 hours
Processing time = 6 hours
Storage time = 7 hours
Flow time of the bike frame = 13 hours (7 + 6)
Value-added percentage of the flow time for this bike frame = 6/13 * 100
= 46%
b) Flow time represents the amount of time a bicycle frame spends in the manufacturing process from setup to end. It is called the total processing time. Unless there is one path through the process, the flow time equals the length of the longest process path. The storage time is not included in the flow time since it is not a manufacturing process.
Answer: (B) Legal hold
Explanation:
As being a security director, the security director are approached to solidify a server that run the red hat enterprise server the 5.5.
The servers are being utilized as DNS (Dynamic host service) and the server time. This is not utilized as the database, print server and the web server. There is no particular remote associations with the server.
The window of the command will be given the root accessing. Then, it provide the associated by means of a protected shell with the access root in the system.
Answer:
Follows are the solution to the given question:
Explanation:
Please find the attached file of the matching.
Arrange: In shape formatting, the "arrange" is used to provide an arrangement in the positing of the shape on the given slide.
shape styles: In shape formatting, it is used for applying a new design to the shape.
size: In shape formatting, the size is used for modifying the shape.
insert shapes: In shape formatting, the insert shape is used to add a new shape.
Wordart styles: In shape formatting, Wordart is used to provide a text design on the shape.