6 pies.
If 8 teachers finish one whole pie, and they need to feed 47, then they need 6 pies with 8 slices each aka 48 slices total, there will be one slice leftover for the principal :D
Answer:
Step-by-step explanation:
Joint variation has the equation
y = kxz
k is the constant of variation and needs to be solved for using the initial conditions, then filled in later to another equation related to the given info to solve for something else. We are given y = amount of oil used, x = distance traveled, z-squared is the speed. Our equation looks like this, to be exact:
Filling in with the initial conditions:
which gives us the
k = .0014166667
Now we need to find the amount of oil used, y, under other circumstances, but this time we have our k.
which gives us that the amount of oil used, when rounded to the tenths,
y = 24.0 barrels
The probability of an event is expressed as
Given:
The probability of drwing two blue balls one after the other is expressed as
For the first draw:
For the second draw, we have only 1 blue ball left out of a total of 6 balls (since a blue ball with drawn earlier).
Thus,
The probability of drawing two blue balls one after the other is evaluted as
The probablity that none of the balls drawn is blue is evaluted as
Hence, the probablity that none of the balls drawn is blue is evaluted as
Answer:
Step-by-step explanation:
We are given the following in the question:
A storage shed is to be built in the shape of a (closed) box with a square base.
Volume = 150 cubic feet
Let s be the edge of square base and h be the height.
Volume of cuboid =
where l is the length, b is the base and h is the height.
Volume of box =
Area of base =
Cost of concrete for the base = $4
Cost of base($) =
Area of roof =
Cost of material for the roof = $2
Cost of roof ($) =
Area of 4 walls =
Cost of material for the side = $2.50
Cost of material of side($) =
Total cost
= Cost of base + Cost of 4 sides + Cost of roof
is the required cost function.
Answer:
X
Step-by-step explanation:
Let X is the number of hours Larry works a day
Given: Larry spends half of his workday teaching piano lessons.
=> Number of hours he teaches piano a day is: X
As we know that, he has 6 students, so the fraction of his workday is spent with each student is:
X : 6
= X
Hope it will find you well during the time of isolation.