Answer:
def print_popcorn_time(bag_ounces):
if bag_ounces<3:
print("Too Small")
elif bag_ounces>10:
print("Too Large")
else:
bag_ounces = bag_ounces*6
print("%s Seconds\n" % bag_ounces)
Explanation:
- Using Python Programming Language
- The function is defined to accept an int parameter
- Within the function body, if...elif and else statements are used to print the desired output
- note the use of the %s placeholder (formated output) and \n for a new line in the final print statement
A computational instruction with operands is command so computational instructionis just a opcode.
B. opcode
Answer:
c. recovery time objective
Explanation:
- Recovery time objective (RTO) is the maximum acceptable duration permitted between an unfortunate loss or failure and the restoration of normal operations and services.
- According to the RTO, the systems, applications or operations must be restored within a targeted time period after a disaster, to avoid unacceptable outcomes of the disruption.
-
So a business process must be recovered within this period of time.
-
It measures how much a failure affects the normal operations, applications and systems and RTO is measures in time units like seconds minutes hours or days.
- In simple words RTO refers to the time you need to restore system, applications and data.
- For instance a 2-hour RTO refers to restore and get operations or services back to running within 2 hours of the service failure or outrage.
Answer:
Kindly check explanation
Explanation:
The environment is our abode which aids the continued survival and growth of plant, animals and humans. The most important components and natural resources which are neceaaaarybto dwell and survive are all waht a makes up an enviromment. The energy derived from the sun aids power generation, plant growthbduring photosynthetic activities which is rewired to produce crops and feed us. The air we breathe are all a part of our enviromment. Therefore, such environment which provides a canvas or platform for our existence must be greatly cared for and no technological innovation, project or design must be allowed to impact negatively on the enviromment. Thus the need for impact assessment of systems in other to ensure that our abode isn't threatened.