-2x + 6y = -34
-x + 3y = -17
x = 3y +17
Sub this into 1st eqn
5(3y + 17) + 2y = 21
15y + 85 + 2y =21
17y = -64
y = -3.7647 (to 5 sig. fig.)
y = -3.8 (to nearest tenth)
Sub y = -3.7647 into 2nd eqn
x = 3(-3.7647) +17
x = 5.7 (to nearest tenth)
Total cost=$142
cost of parts=$62
cost paid for labour=$142-$62=$80
According to question,
》cost of labour per hr=$32
which can be written as,
》cost of labour/time=$32
Use cross multiplication,
》time=cost of labour/32
Since cost of labour is 80,
Time=80/32
=2.5hrs
First, you must understand the question. what % of 60 is 15, so I would write an equation to express this.
15 = 60x
From there, solve for x, so Divide by 60 on each side. The answer is 1/4, or 25%
Step-by-step explanation:
<h2>Answer:-</h2><h3>Given ,</h3>
The figure is Similar.
Observation:-
Similar figures have similar sides. If we see carefully in smaller triangle, 3 has been added to each side and they are similar. We need to find y.
We have :-
5+3=8 as similar sides.
So, applying same algorithm,



is the answer.
Hope it helps :)