Answer: B - Communications and Information Management
Explanation: NIMS (National Incident Management System) is a system initiated by the Federal Government to assist responders on how to respond and react to emergencies.
There are six components of NIMS and they include:
1. Command & Management
2. Preparedness
3.Resource Management
4. Communications and Information Management
5. Supporting Technologies
6. On-going Management Maintenance
Our focus is on the Communications and Information Management. It has to do with how information and decision making is managed and how well it is communicated to all the necessary personnel.
Answer:
Incomplete question
First aspect of the question is typed below.
The shape of the distribution of the time required to get an oil change at a 20-minute oil-change facility
is unknown. However, records indicate that the mean time is 2l.2-minutes, and the standard deviation 3.5 minutes.
Explanation:
Employees bonus $50
35 oil changes between 10:00 am to 12:00pm
n = 35
10% changes
So, the z - score can be calculated using
z-score = InvNorm(0.10)
z-score = -1.28
So, given that,
Standard deviation is 3.5minutes
σ = 3.5 minutes
Mean time is 21.2 minutes
μx = 21.2 minutes
Then,
σx = σ / √n
σx = 3.5 / √35
σx = 0.5916 minutes
Then, Z score can be written as
Z = (x - μx) / σx
-1.28 = (x - 21.2) / 0.5916
Cross multiply
-1.28 × 0.5916 = x - 21.2
-0.7573 = x - 21.2
x = 21.2 - 0.7573
x = 20.443 minutes
There is a 10% chance of being at or below a mean oil-change time of 20.44 minutes
Answer:
Given that generators generate greater profit with less consumption of hours, the maximum profit would be building 130 generators, obtaining $ 32,500 of profit, and there would be 10 hours of testing left over.
Explanation:
Since the Electrotech Corporation manufactures two industrial-sized electrical devices: generators and alternators, and both of these products require wiring and testing during the assembly process, and each generator requires 2 hours of wiring and 1 hour of testing and can be sold for a $ 250 profit, while each alternator requires 3 hours of wiring and 2 hours of testing and can be sold for a $ 150 profit, and there are 260 hours of wiring time and 140 hours of testing time available in the next production period and Electrotech wants to maximize profit, to determine this situation the following mathematical logical reasoning must be carried out:
260/2 = 130
140 - 130 = 10
130 generators = 32,500
Thus, given that generators generate greater profit with less consumption of hours, the maximum profit would be building 130 generators, obtaining $ 32,500 of profit, and there would be 10 hours of testing left over.
Answer:
Procedure.
Explanation:
A procedure can be defined as a comprehensive set of sequential steps and actions which is typically used to specify the accepted, effective and efficient method for performing a task or executing a project and plans.
This ultimately implies that, procedures are mainly used by various companies or organizations to always achieve a standardized level of output and consistency in achieving its goals and objectives.
Hence, if you want all your stores to only accept returns with receipts this would be an example of a procedure.