Answer:
P = 9; A = 3
Step-by-step explanation:
a)
1. ATC is similar to GDO
2. 12 / 3 = 4
3. Triangle A has to be divided by 4 to figure out what Triangle B is
4. GD = 3, GO = 4, DO = 2
5. P = 3 + 4 + 2 + 9
b)
1. B = 2, H = 3
2. Plug into given equation (A = 1/2bh)
3. A = 1/2*2*3
4. 1/2 * 6
5. A = 3
Q1. p=a-i
Q2. l= 1/2p-w
Q3. t=d/s
I think that these are correct
Answer:
the last option
Step-by-step explanation:
not exactly sure how to explain it :/
Using the normal distribution, it is found that a production worker has to make $542.64 a week to be in the top 30% of wage earners.
<h3>Normal Probability Distribution</h3>
In a normal distribution with mean
and standard deviation
, the z-score of a measure X is given by:

- It measures how many standard deviations the measure is from the mean.
- After finding the z-score, we look at the z-score table and find the p-value associated with this z-score, which is the percentile of X.
In this problem:
- The mean is of
.
- The standard deviation is of
.
- The lower bound of the top 30% is the 70th percentile, which is X when Z has a p-value of 0.7, so <u>X when Z = 0.84.</u>




A production worker has to make $542.64 a week to be in the top 30% of wage earners.
You can learn more about the normal distribution at brainly.com/question/24663213
Answer:
It took 2.5 (2 and a half) minutes to fill up one tire
Step-by-step explanation:
Hope this helps :)